STUDY OF FLOODPLAIN MODELLING BASED ON RISK, CASE STUDY DENGKENG RIVER, KLATEN REGENCY
<br /> <br /> Failure of the flood control system may be due to various factors, including the uncertainty of the magnitude of the flood discharge of the plan resulting in the capacity of the system to be exceeded from the calculated. The existence of the uncertainty factor is recognize...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/22843 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|