Elisman, O. STRENGTHEN THE PROJECT CONTROL MECHANISM IN MANAGING COAL MINING BUSINESS RISK WITH A CAPITAL BUDGETING APPROACH: STUDY IN PT. XYZ.
استشهاد بنمط شيكاغوElisman, Ongky. STRENGTHEN THE PROJECT CONTROL MECHANISM IN MANAGING COAL MINING BUSINESS RISK WITH A CAPITAL BUDGETING APPROACH: STUDY IN PT. XYZ.
MLA استشهادElisman, Ongky. STRENGTHEN THE PROJECT CONTROL MECHANISM IN MANAGING COAL MINING BUSINESS RISK WITH A CAPITAL BUDGETING APPROACH: STUDY IN PT. XYZ.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.