DESIGN OF BORED PILE FOUNDATIONS AND TIE BACK WALLS OF GRAND THEATER SENEN CINEMA
The Grand Theater Senen Cinema is designed to have 3 levels of main building and 2 levels of basement as a parking lot. In this project, geotechnical expertise is needed to design a foundation system to carry the structural loads and a retaining wall system to ensure safety during the basement excav...
Saved in:
主要作者: | Deric |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/67928 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
相似書籍
-
THE PLANNING OF GRAND THEATER CINEMA OF SENEN
由: Tri Pangputra, Johansen -
STRUCTURAL DESIGN OF GRAND THEATER SENEN
由: Lim, Terrance -
REMINISCING THE GLORY OF SENEN: REVITALIZATION OF GRAND THEATER CINEMA AS A FILM COLLABORATION SPACE
由: Rahmi Nur Annisa, Febrina -
BORED PILE FOUNDATION AND SECANT PILE WALL DESIGN OF SERENA ARC HOTEL BANDUNG
由: Rizki Prabono, Muhammad -
DESIGN OF DIAPHRAGM WALL AND BORED PILE FOUNDATION OFFICE BUILDING IN SERPONG
由: HANUN, FATIMA