CONTINUOUS GIRDER BRIDGE STRUCTURAL DESIGN MANADO-BITUNG TOLL ROAD

In the construction of the Manado-Bitung Toll Road, there is an obstacle in the form of a valley approximately 55 meters deep from the planned elevation. Therefore, a bridge is needed to connect the ravine. In this final design assignment, the author will design a bridge at this location. Based o...

全面介紹

Saved in:
書目詳細資料
主要作者: Siswaji, Vincent
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/81574
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:In the construction of the Manado-Bitung Toll Road, there is an obstacle in the form of a valley approximately 55 meters deep from the planned elevation. Therefore, a bridge is needed to connect the ravine. In this final design assignment, the author will design a bridge at this location. Based on the geographical conditions, tall pillars are needed to support the bridge structure. The pillars used on the Pinokalan Bridge reach a height of 41 meters, so the lateral deformation that can occur in earthquake conditions will be very large so that using a simple support system becomes less technically feasible. If a simple support system is used, a bearing system with high stiffness is required. Therefore, a continuous girder bridge system is used but still uses PCI girders. In addition, the location of the bridge is in Seismic Design Category D so the author also conducted a pushover analysis to design the bridge pillars.