Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia

Decommissioning of offshore installations presents a major liability due to the complexity in a sensitive environment as well as the huge sum of money involve in its operations. Therefore, an appropriate cost planning of decommissioning is needed. This study is aimed at developing a site specific un...

Full description

Saved in:
Bibliographic Details
Main Author: Abd Rahim @ Rusling, Nurul Suhara
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2014
Online Access:http://utpedia.utp.edu.my/13417/1/18.pdf
http://utpedia.utp.edu.my/13417/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
id my-utp-utpedia.13417
record_format eprints
spelling my-utp-utpedia.134172017-01-25T09:37:53Z http://utpedia.utp.edu.my/13417/ Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia Abd Rahim @ Rusling, Nurul Suhara Decommissioning of offshore installations presents a major liability due to the complexity in a sensitive environment as well as the huge sum of money involve in its operations. Therefore, an appropriate cost planning of decommissioning is needed. This study is aimed at developing a site specific unit cost index pertaining to year of decommissioning offshore platform. In particular, this study will focus on the transportation aspect of decommissioning of offshore platform because it contribute high percentage in cost of decommissioning. Laspeyres index formulas were used to compute a series of years from 2009 to 2013 for unit transportation cost index. With a series of cost index, the rate of inflation for the transportation were predicted based on the previous data. Analysis and interpretation on the price level is discussed in this report. The inflationary trend is used to project the upcoming price level. In conclusion, cost index is very useful in planning the decommissioning of offshore platform installation and more importantly it also helps in producing reliable cost estimation. For future research, it is recommended to have a series of inflationary trend on transportation for at least more than 10 years to obtain accurate projection of price level. In addition, this research study can initiate another set of unit cost index for different cost element for decommissioning such as equipment. It has also been recommended that, further research should be conducted to establish cost index for the whole platform. Universiti Teknologi Petronas 2014-01 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/13417/1/18.pdf Abd Rahim @ Rusling, Nurul Suhara (2014) Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia. Universiti Teknologi Petronas.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
description Decommissioning of offshore installations presents a major liability due to the complexity in a sensitive environment as well as the huge sum of money involve in its operations. Therefore, an appropriate cost planning of decommissioning is needed. This study is aimed at developing a site specific unit cost index pertaining to year of decommissioning offshore platform. In particular, this study will focus on the transportation aspect of decommissioning of offshore platform because it contribute high percentage in cost of decommissioning. Laspeyres index formulas were used to compute a series of years from 2009 to 2013 for unit transportation cost index. With a series of cost index, the rate of inflation for the transportation were predicted based on the previous data. Analysis and interpretation on the price level is discussed in this report. The inflationary trend is used to project the upcoming price level. In conclusion, cost index is very useful in planning the decommissioning of offshore platform installation and more importantly it also helps in producing reliable cost estimation. For future research, it is recommended to have a series of inflationary trend on transportation for at least more than 10 years to obtain accurate projection of price level. In addition, this research study can initiate another set of unit cost index for different cost element for decommissioning such as equipment. It has also been recommended that, further research should be conducted to establish cost index for the whole platform.
format Final Year Project
author Abd Rahim @ Rusling, Nurul Suhara
spellingShingle Abd Rahim @ Rusling, Nurul Suhara
Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
author_facet Abd Rahim @ Rusling, Nurul Suhara
author_sort Abd Rahim @ Rusling, Nurul Suhara
title Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
title_short Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
title_full Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
title_fullStr Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
title_full_unstemmed Unit Transportation Cost Index for Decommissioning Offshore Platforms in Malaysia
title_sort unit transportation cost index for decommissioning offshore platforms in malaysia
publisher Universiti Teknologi Petronas
publishDate 2014
url http://utpedia.utp.edu.my/13417/1/18.pdf
http://utpedia.utp.edu.my/13417/
_version_ 1739831894145499136