Cold and hot water plumbing system on living quarters in an offshore platform

The detailed development for East Piatu (EP) will have a separate Wellhead Platform (WP) with 12 well slots, bridge linked to a manned Centnu Production Platform (CPP) in 63 meters water depth. Produced oil and gas will be exported via pipelines and tie-in to the export pipelines ofLarut·A produc...

Full description

Saved in:
Bibliographic Details
Main Author: SHAHIR, ADIB ZULFADHLI
Format: Final Year Project
Language:English
Published: IRC 2011
Subjects:
Online Access:http://utpedia.utp.edu.my/15275/1/Hot%20And%20Cold%20Water%20Plumbing%20System%20On%20Living%20Quarters%20In%20An%20Offshore%20Platfrom.pdf
http://utpedia.utp.edu.my/15275/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
Description
Summary:The detailed development for East Piatu (EP) will have a separate Wellhead Platform (WP) with 12 well slots, bridge linked to a manned Centnu Production Platform (CPP) in 63 meters water depth. Produced oil and gas will be exported via pipelines and tie-in to the export pipelines ofLarut·A production platform. In an offshore platform, living quarters is an accommodation for all offshore workers. It is also equipped with kitchen, canteen, management offices, workshops and recreation areas. The importance of living quarters can be summarized with this statement, an oil platform needs workers, and workers need accommodations. Accommodations are Living Quarters. Good established living quarters is a well functioned living quarters. Well functioned living quarters should have a good piping system. The project focuses on the cold and hot water plumbing system of a living quarter. The living quarters will have 4 levels and each level will be supply with hot and cold water system.