Comparison of Elastic Modulus between Class G Cement and Geopolymer Cement under HPHT Condition
Well cementing is one of the important systems in oil and gas drilling. It provides support and protection to the casing, prevent the movement of fluid through the annular space outside the casing; stop the movement of fluid into vugular or fractured formations and it also use to close an abandoned...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
IRC
2015
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/16840/1/FYP%20Final%20Dissertation.pdf http://utpedia.utp.edu.my/16840/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
Language: | English |
Be the first to leave a comment!