A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin

A building is a place of protection giants the climate and rain. So, it has to fulfill safety aspects and provide a comfort to the occupant or owner of the building. In order to ensure the building can function accurately, it needs to be managed effectively. Management begins form the design proposa...

Full description

Saved in:
Bibliographic Details
Main Author: Kamaludin, Zaliha
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/41395/1/41395.pdf
https://ir.uitm.edu.my/id/eprint/41395/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.41395
record_format eprints
spelling my.uitm.ir.413952022-10-03T06:14:11Z https://ir.uitm.edu.my/id/eprint/41395/ A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin Kamaludin, Zaliha Building fittings and their installation A building is a place of protection giants the climate and rain. So, it has to fulfill safety aspects and provide a comfort to the occupant or owner of the building. In order to ensure the building can function accurately, it needs to be managed effectively. Management begins form the design proposal stage, plan approval process, building control, completion abs issue out the certificate of fitness and lastly building maintenance. Approval from local authority is essential before construction work implemented. The role of local authority as building controller for a particular building is to ensure that all necessary requirements followed. It is the reasonability of the consultant to prepare proper planning of the building in order to fulfill the building requirement as needed in the Road, Drainage and Building Act (Act 133), UBBL 1984 and policies as well. So, this dissertation will enlighten with more detail regarding the process undergo in order to apply for CF which starts in the early process of application until the building is twisted. The researchers of this dissertation will involves three local authorities, which are Selayang Municipal Council, Petaling Jaya Municipal Council and Ampang Jaya Municipal Council and also developers at Klang Valley Area. This dissertation will also recognize problems occur in the CFs application process. Besides that, it will also illustrate and propose measures or method to solve these problems. This dissertation will consists of several research projects, which are taken to be analyzed linking the problem of lateness in getting CFs approval Nevertheless the most important thing to be achieved in this dissertation is to describe the proper process of approval CFs and also to identify the critical problems that are faced by several parties concerning the approval whether directly or indirectly Furthermore, the author will also verify measure and proposals to overcome the mentioned problems in order to develop the system in the near future 2003 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/41395/1/41395.pdf A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin. (2003) Degree thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building fittings and their installation
spellingShingle Building fittings and their installation
Kamaludin, Zaliha
A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
description A building is a place of protection giants the climate and rain. So, it has to fulfill safety aspects and provide a comfort to the occupant or owner of the building. In order to ensure the building can function accurately, it needs to be managed effectively. Management begins form the design proposal stage, plan approval process, building control, completion abs issue out the certificate of fitness and lastly building maintenance. Approval from local authority is essential before construction work implemented. The role of local authority as building controller for a particular building is to ensure that all necessary requirements followed. It is the reasonability of the consultant to prepare proper planning of the building in order to fulfill the building requirement as needed in the Road, Drainage and Building Act (Act 133), UBBL 1984 and policies as well. So, this dissertation will enlighten with more detail regarding the process undergo in order to apply for CF which starts in the early process of application until the building is twisted. The researchers of this dissertation will involves three local authorities, which are Selayang Municipal Council, Petaling Jaya Municipal Council and Ampang Jaya Municipal Council and also developers at Klang Valley Area. This dissertation will also recognize problems occur in the CFs application process. Besides that, it will also illustrate and propose measures or method to solve these problems. This dissertation will consists of several research projects, which are taken to be analyzed linking the problem of lateness in getting CFs approval Nevertheless the most important thing to be achieved in this dissertation is to describe the proper process of approval CFs and also to identify the critical problems that are faced by several parties concerning the approval whether directly or indirectly Furthermore, the author will also verify measure and proposals to overcome the mentioned problems in order to develop the system in the near future
format Thesis
author Kamaludin, Zaliha
author_facet Kamaludin, Zaliha
author_sort Kamaludin, Zaliha
title A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
title_short A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
title_full A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
title_fullStr A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
title_full_unstemmed A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin
title_sort study on the lateness factors in getting certificate of fitness (cfs) / zaliha kamaludin
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/41395/1/41395.pdf
https://ir.uitm.edu.my/id/eprint/41395/
_version_ 1746213068063375360