Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif

According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate info...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Arif, Adriana
Format: Student Project
Language:English
Published: 2014
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf
http://ir.uitm.edu.my/id/eprint/44091/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.44091
record_format eprints
spelling my.uitm.ir.440912021-03-29T12:12:36Z http://ir.uitm.edu.my/id/eprint/44091/ Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif Mohd Arif, Adriana Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation Environmental risk assessment Malaysia Environmental disasters Malaysia Enviromental management Malaysia Issues management According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate information about the impacts on the environment of a proposed project and to detail out the mitigating measures prior to project approval and implementation. During the EIA process, the Environmental Management Plan (hereinafter called ‘EMP’) is a part of EIA studies. The objective of EMP is to make sure the overall project comply with legislation, policy, guidelines and EIA approval conditions. It also provides support to the planning of environmental management of the project, include resource allocation. EMP typically contains a detailed programme for execution of environmental works which is integrated with the overall project programme. This typically includes management of soil erosion, siltation, air, water pollution and hazardous substances. The benefits of EMP is with the management plan, it will increase in environmental awareness of all parties. It also increases in training opportunities. 2014 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf Mohd Arif, Adriana (2014) Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation
Environmental risk assessment
Malaysia
Environmental disasters
Malaysia
Enviromental management
Malaysia
Issues management
spellingShingle Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation
Environmental risk assessment
Malaysia
Environmental disasters
Malaysia
Enviromental management
Malaysia
Issues management
Mohd Arif, Adriana
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
description According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate information about the impacts on the environment of a proposed project and to detail out the mitigating measures prior to project approval and implementation. During the EIA process, the Environmental Management Plan (hereinafter called ‘EMP’) is a part of EIA studies. The objective of EMP is to make sure the overall project comply with legislation, policy, guidelines and EIA approval conditions. It also provides support to the planning of environmental management of the project, include resource allocation. EMP typically contains a detailed programme for execution of environmental works which is integrated with the overall project programme. This typically includes management of soil erosion, siltation, air, water pollution and hazardous substances. The benefits of EMP is with the management plan, it will increase in environmental awareness of all parties. It also increases in training opportunities.
format Student Project
author Mohd Arif, Adriana
author_facet Mohd Arif, Adriana
author_sort Mohd Arif, Adriana
title Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
title_short Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
title_full Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
title_fullStr Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
title_full_unstemmed Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
title_sort case study on environmental management plan (emp) / adriana mohd arif
publishDate 2014
url http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf
http://ir.uitm.edu.my/id/eprint/44091/
_version_ 1696979087370747904