Piling works at Pasir Puteh Sentral ( PPS ) / Ahmad Rifai’e Che Daud
This report briefly describes the process and methods involved in piling works. It is produced based on the experience of the past five months stationed at the site project. This report is divided by sections and start with the background of the construction project. The observation found that the p...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/45795/1/45795.pdf http://ir.uitm.edu.my/id/eprint/45795/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |