Simulation of production capacity using basic language / Faizul Azlan Abdullah.

This project of production volume was originated by Encik Abdul Rahman Omar in his ' project The Management Game and presented in 1983. However in this report only part of the initial report taken to be improved, that is the production capacity section. In the previous management game, the prod...

Full description

Saved in:
Bibliographic Details
Main Author: Abdullah, Faizul Azlan
Format: Student Project
Language:English
Published: 1991
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/52230/1/52230.pdf
https://ir.uitm.edu.my/id/eprint/52230/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.52230
record_format eprints
spelling my.uitm.ir.522302021-11-12T02:28:39Z https://ir.uitm.edu.my/id/eprint/52230/ Simulation of production capacity using basic language / Faizul Azlan Abdullah. Abdullah, Faizul Azlan Machine shops and machine shop practice Mechanics applied to machinery. Dynamics Machine design and drawing This project of production volume was originated by Encik Abdul Rahman Omar in his ' project The Management Game and presented in 1983. However in this report only part of the initial report taken to be improved, that is the production capacity section. In the previous management game, the production only takes into account the existing workers without acknowledge certain aspects about workers behavior in the organization. As understood, workers behavior is the most important aspect in a production organization. This has been rectified and modified to ensure that it is introduced into the game. However this program is made independently from the main program in the previous project. Certain modifications' have to be made to this program in order to suit the program into the main program. It is to be noted that only the production capacity with certain variables are taken into consideration. Other variables such as financial requirement are assumed enough to make the production run smoothly and is not considered in the program. The variables are-as the same as the previous report, which are workers (unskilled, semi-skilled and skilled), raw material, and machine available. Addition have been made in the workers variables such as incentive wages, effect of too many unskilled workers employed etc. It is program in such a way that the decision about these factors will affect the production volume. 1991 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/52230/1/52230.pdf ID52230 Abdullah, Faizul Azlan (1991) Simulation of production capacity using basic language / Faizul Azlan Abdullah. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Machine shops and machine shop practice
Mechanics applied to machinery. Dynamics
Machine design and drawing
spellingShingle Machine shops and machine shop practice
Mechanics applied to machinery. Dynamics
Machine design and drawing
Abdullah, Faizul Azlan
Simulation of production capacity using basic language / Faizul Azlan Abdullah.
description This project of production volume was originated by Encik Abdul Rahman Omar in his ' project The Management Game and presented in 1983. However in this report only part of the initial report taken to be improved, that is the production capacity section. In the previous management game, the production only takes into account the existing workers without acknowledge certain aspects about workers behavior in the organization. As understood, workers behavior is the most important aspect in a production organization. This has been rectified and modified to ensure that it is introduced into the game. However this program is made independently from the main program in the previous project. Certain modifications' have to be made to this program in order to suit the program into the main program. It is to be noted that only the production capacity with certain variables are taken into consideration. Other variables such as financial requirement are assumed enough to make the production run smoothly and is not considered in the program. The variables are-as the same as the previous report, which are workers (unskilled, semi-skilled and skilled), raw material, and machine available. Addition have been made in the workers variables such as incentive wages, effect of too many unskilled workers employed etc. It is program in such a way that the decision about these factors will affect the production volume.
format Student Project
author Abdullah, Faizul Azlan
author_facet Abdullah, Faizul Azlan
author_sort Abdullah, Faizul Azlan
title Simulation of production capacity using basic language / Faizul Azlan Abdullah.
title_short Simulation of production capacity using basic language / Faizul Azlan Abdullah.
title_full Simulation of production capacity using basic language / Faizul Azlan Abdullah.
title_fullStr Simulation of production capacity using basic language / Faizul Azlan Abdullah.
title_full_unstemmed Simulation of production capacity using basic language / Faizul Azlan Abdullah.
title_sort simulation of production capacity using basic language / faizul azlan abdullah.
publishDate 1991
url https://ir.uitm.edu.my/id/eprint/52230/1/52230.pdf
https://ir.uitm.edu.my/id/eprint/52230/
_version_ 1717097195359961088