Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi

Nowadays, the construction industry has been rapid and advanced. This report will discuss about construction wall of the selected case study, Caspia 2 – Puncak Iskandar. It produced refer on experience for four months stationed on the site of the construction project. This report divides a few parts...

Full description

Saved in:
Bibliographic Details
Main Author: Azemi, Mohd Alif Aiman
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/57007/1/57007.pdf
https://ir.uitm.edu.my/id/eprint/57007/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English