Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz

Value Management is relatively new to our construction industry and is still in its infancy in the Malaysian construction industry. It was originated from the United States with Lawrence Miles as the founder of Value Engineering, as it was popularly known at that time. It has undergone various chang...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Abdul Aziz, Wan Assad Qutubuldin
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/73869/1/73869.pdf
https://ir.uitm.edu.my/id/eprint/73869/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.73869
record_format eprints
spelling my.uitm.ir.738692023-03-24T01:44:19Z https://ir.uitm.edu.my/id/eprint/73869/ Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz Wan Abdul Aziz, Wan Assad Qutubuldin Management. Industrial Management Construction industry Value Management is relatively new to our construction industry and is still in its infancy in the Malaysian construction industry. It was originated from the United States with Lawrence Miles as the founder of Value Engineering, as it was popularly known at that time. It has undergone various changes and adjustment from the early days it was developed until today. The purpose of Value Management study is to optimize the requirements of those with an interest in the project. It involves a multidisciplinary team who works together in a structured and systematic workshop reviewing the existing designs and proposals through the functional analysis. It concerns in the elimination or modification to the items that have unnecessary costs but improving or maintaining the quality and functions. This research is limited to the application of Value Management during preliminary stages which end during design stages. Interviews were held with various parties involved in the construction industry within the area of Klang Valley and Johor Bahru only. From the interviews, the writer found that Value Management has started to be accepted as a chosen method for reducing cost whilst maintaining the functionality but still, it has a long road to travel to achieve its goal of an accepted and recognized technique in the industry. Today, the road is there but it is being paved from time to time by the outstanding achievements of those value managers/practitioners who foresee the potential rewards to be gained by the implementation of Value Management in the future. 2003 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/73869/1/73869.pdf Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz. (2003) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Management. Industrial Management
Construction industry
spellingShingle Management. Industrial Management
Construction industry
Wan Abdul Aziz, Wan Assad Qutubuldin
Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
description Value Management is relatively new to our construction industry and is still in its infancy in the Malaysian construction industry. It was originated from the United States with Lawrence Miles as the founder of Value Engineering, as it was popularly known at that time. It has undergone various changes and adjustment from the early days it was developed until today. The purpose of Value Management study is to optimize the requirements of those with an interest in the project. It involves a multidisciplinary team who works together in a structured and systematic workshop reviewing the existing designs and proposals through the functional analysis. It concerns in the elimination or modification to the items that have unnecessary costs but improving or maintaining the quality and functions. This research is limited to the application of Value Management during preliminary stages which end during design stages. Interviews were held with various parties involved in the construction industry within the area of Klang Valley and Johor Bahru only. From the interviews, the writer found that Value Management has started to be accepted as a chosen method for reducing cost whilst maintaining the functionality but still, it has a long road to travel to achieve its goal of an accepted and recognized technique in the industry. Today, the road is there but it is being paved from time to time by the outstanding achievements of those value managers/practitioners who foresee the potential rewards to be gained by the implementation of Value Management in the future.
format Thesis
author Wan Abdul Aziz, Wan Assad Qutubuldin
author_facet Wan Abdul Aziz, Wan Assad Qutubuldin
author_sort Wan Abdul Aziz, Wan Assad Qutubuldin
title Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
title_short Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
title_full Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
title_fullStr Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
title_full_unstemmed Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz
title_sort application of value management in construction industry during early stages / wan assad qutubuldin wan abdul aziz
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/73869/1/73869.pdf
https://ir.uitm.edu.my/id/eprint/73869/
_version_ 1761622405757796352