A review of causes of delay in construction projects

Time is one of the keys by which project success can be measured. However, delay in construction projects remains a common occurrence. This paper attempts towards reviewing past literature on causes of delay in different types of construction. The most common methods adopted by researchers for cause...

Full description

Saved in:
Bibliographic Details
Main Authors: Al-Mohammad, Mohammad, Omar, Jamaludin
Format: Article
Language:English
Published: Science Publishing Corporation 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/24518/1/A%20review%20of%20causes%20of%20delay%20in%20construction%20projects.pdf
http://umpir.ump.edu.my/id/eprint/24518/
https://www.sciencepubco.com/index.php/ijet/article/view/19506
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.24518
record_format eprints
spelling my.ump.umpir.245182019-03-18T00:38:29Z http://umpir.ump.edu.my/id/eprint/24518/ A review of causes of delay in construction projects Al-Mohammad, Mohammad Omar, Jamaludin TA Engineering (General). Civil engineering (General) TH Building construction Time is one of the keys by which project success can be measured. However, delay in construction projects remains a common occurrence. This paper attempts towards reviewing past literature on causes of delay in different types of construction. The most common methods adopted by researchers for causes of delay identification were presented. This review also discussed the groups causing delay based on the source of delay. The top five delay factors related to contractor, owner and consultant have been discussed within each category. This paper revealed that previous researches are regarded as the main source for causes of delay identification. Moreover, questionnaire and the relative importance index are the most frequent methods for collecting data and ranking delay factors, respectively. Contractor, owner and consultant groups are the highest frequent groups utilized for categorization. Furthermore, causes of delay related to contractor and owner are of great importance. While consultant group and its relevant causes have shown lesser importance relatively. Science Publishing Corporation 2018 Article PeerReviewed pdf en cc_by_4 http://umpir.ump.edu.my/id/eprint/24518/1/A%20review%20of%20causes%20of%20delay%20in%20construction%20projects.pdf Al-Mohammad, Mohammad and Omar, Jamaludin (2018) A review of causes of delay in construction projects. International Journal of Engineering & Technology, 7 (4). pp. 5078-5083. ISSN 2227-524X https://www.sciencepubco.com/index.php/ijet/article/view/19506
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Al-Mohammad, Mohammad
Omar, Jamaludin
A review of causes of delay in construction projects
description Time is one of the keys by which project success can be measured. However, delay in construction projects remains a common occurrence. This paper attempts towards reviewing past literature on causes of delay in different types of construction. The most common methods adopted by researchers for causes of delay identification were presented. This review also discussed the groups causing delay based on the source of delay. The top five delay factors related to contractor, owner and consultant have been discussed within each category. This paper revealed that previous researches are regarded as the main source for causes of delay identification. Moreover, questionnaire and the relative importance index are the most frequent methods for collecting data and ranking delay factors, respectively. Contractor, owner and consultant groups are the highest frequent groups utilized for categorization. Furthermore, causes of delay related to contractor and owner are of great importance. While consultant group and its relevant causes have shown lesser importance relatively.
format Article
author Al-Mohammad, Mohammad
Omar, Jamaludin
author_facet Al-Mohammad, Mohammad
Omar, Jamaludin
author_sort Al-Mohammad, Mohammad
title A review of causes of delay in construction projects
title_short A review of causes of delay in construction projects
title_full A review of causes of delay in construction projects
title_fullStr A review of causes of delay in construction projects
title_full_unstemmed A review of causes of delay in construction projects
title_sort review of causes of delay in construction projects
publisher Science Publishing Corporation
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/24518/1/A%20review%20of%20causes%20of%20delay%20in%20construction%20projects.pdf
http://umpir.ump.edu.my/id/eprint/24518/
https://www.sciencepubco.com/index.php/ijet/article/view/19506
_version_ 1643669851525349376