Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study

Building Information Modelling (BIM) enables close collaboration among project stakeholders to visualize what is to be built in a simulated environment by identifying any potential design, construction or operational issues. Despite the fact of its well-documented benefits, the extensive integration...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad Huzaimi, Abd Jamil, Mohamad Syazli, Fathi
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26303/1/Contractual%20issues%20for%20building%20information%20modelling%20%28BIM%29.pdf
http://umpir.ump.edu.my/id/eprint/26303/
https://doi.org/10.1088/1757-899X/513/1/012035
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.26303
record_format eprints
spelling my.ump.umpir.263032019-12-20T08:14:15Z http://umpir.ump.edu.my/id/eprint/26303/ Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study Ahmad Huzaimi, Abd Jamil Mohamad Syazli, Fathi HD Industries. Land use. Labor K Law (General) TH Building construction Building Information Modelling (BIM) enables close collaboration among project stakeholders to visualize what is to be built in a simulated environment by identifying any potential design, construction or operational issues. Despite the fact of its well-documented benefits, the extensive integration of BIM throughout the project lifecycle remains sporadic. The conventional contracts used in the Malaysian construction industry were established before the development of BIM. As BIM becoming ingrain in the delivery process, the inadequacies of these existing contracts have become visible. This paper presents the results of an exploratory case study using Qualitative Content Analysis dedicated to a BIM project and discusses a procurement approach of BIM to establish the contractual context by addressing the legal and contractual impediments namely; intellectual property, liability and process related risks-allocation in a Malaysian public construction. This paper also outlines the reasons why the implementation of BIM will foster the evolution of integrated contract delivery methods. IOP Publishing 2019-04-25 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/26303/1/Contractual%20issues%20for%20building%20information%20modelling%20%28BIM%29.pdf Ahmad Huzaimi, Abd Jamil and Mohamad Syazli, Fathi (2019) Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study. In: IOP Conference Series: Materials Science and Engineering, 10th Asia Pacific Structural Engineering and Construction Conference 2018, 13-15 November 2018 , Langkawi, Malaysia. pp. 1-9., 513 (012035). ISSN 1757-8981 (Print), 1757-899X (Online) https://doi.org/10.1088/1757-899X/513/1/012035
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic HD Industries. Land use. Labor
K Law (General)
TH Building construction
spellingShingle HD Industries. Land use. Labor
K Law (General)
TH Building construction
Ahmad Huzaimi, Abd Jamil
Mohamad Syazli, Fathi
Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
description Building Information Modelling (BIM) enables close collaboration among project stakeholders to visualize what is to be built in a simulated environment by identifying any potential design, construction or operational issues. Despite the fact of its well-documented benefits, the extensive integration of BIM throughout the project lifecycle remains sporadic. The conventional contracts used in the Malaysian construction industry were established before the development of BIM. As BIM becoming ingrain in the delivery process, the inadequacies of these existing contracts have become visible. This paper presents the results of an exploratory case study using Qualitative Content Analysis dedicated to a BIM project and discusses a procurement approach of BIM to establish the contractual context by addressing the legal and contractual impediments namely; intellectual property, liability and process related risks-allocation in a Malaysian public construction. This paper also outlines the reasons why the implementation of BIM will foster the evolution of integrated contract delivery methods.
format Conference or Workshop Item
author Ahmad Huzaimi, Abd Jamil
Mohamad Syazli, Fathi
author_facet Ahmad Huzaimi, Abd Jamil
Mohamad Syazli, Fathi
author_sort Ahmad Huzaimi, Abd Jamil
title Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
title_short Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
title_full Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
title_fullStr Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
title_full_unstemmed Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
title_sort contractual issues for building information modelling (bim)-based construction projects: an exploratory case study
publisher IOP Publishing
publishDate 2019
url http://umpir.ump.edu.my/id/eprint/26303/1/Contractual%20issues%20for%20building%20information%20modelling%20%28BIM%29.pdf
http://umpir.ump.edu.my/id/eprint/26303/
https://doi.org/10.1088/1757-899X/513/1/012035
_version_ 1654960232766373888