Factors affecting BIM implementation in post-conflict low-income economies: the case of Afghanistan

Purpose Rejecting building information modeling (BIM) can negatively impact the architectural, engineering and construction (AEC) industries. While BIM is trending globally, its implementation in post-conflict low-income economies is still limited. The purpose of this paper is to identify the criti...

Full description

Saved in:
Bibliographic Details
Main Authors: Al-Mohammad, Mohammad, Ahmad Tarmizi, Haron, Mohammad Numan, Aloko, Rahimi, A. Rahman
Format: Article
Language:English
Published: Emerald Publishing Limited 2021
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/31912/2/Factors%20affecting%20BIM.pdf
http://umpir.ump.edu.my/id/eprint/31912/
https://doi.org/10.1108/JEDT-04-2021-0205
https://doi.org/10.1108/JEDT-04-2021-0205
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English