The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach
Previous research has shown that delay is a common problem in construction industry. Weather condition and regulation changes, though being minor factors, are also known as external factors contributing to the delay of project construction. This study involved 118 respondents from the construction...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Malaysia Pahang
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/32786/1/The%20influence%20of%20delay%20factors%20on%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/32786/ https://doi.org/10.15282/ijim.11.1.2021.6120 https://doi.org/10.15282/ijim.11.1.2021.6120 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |