Factors that affect the performance of public project in Malaysia

Public project is covers most of the infrastructure and facilities needs such as schools, hospitals, administration offices, religious buildings and many more. This paper based on study that has been conducted which involves types of public project and problems of handling public project. This study...

Full description

Saved in:
Bibliographic Details
Main Author: Norsyahidatul Nazirah , Ismail
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/7884/1/NORSYAHIDATUL_NAZIRAH_BINTI_ISMAIL.PDF
http://umpir.ump.edu.my/id/eprint/7884/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
Description
Summary:Public project is covers most of the infrastructure and facilities needs such as schools, hospitals, administration offices, religious buildings and many more. This paper based on study that has been conducted which involves types of public project and problems of handling public project. This study also focused on factors that affect the performance of public project in Malaysia. To achieve the objective of this study, 140 sets of questionnaire have been sending to twenty (20) companies and eight (8) Jabatan Kerja Raya (JKR) main branches around Malaysia. Average Index (AT) method have been use to analyze data that has been collected. It was found that, there are eleven (11) types of public project and the highest occurrence is public facilities project. Nevertheless, there are twelve (12) problems of handling public project in Malaysia and the highest frequency of occurrence is social issues. There are four factors that affect the performance of public project in Malaysia which are cost, time, quality and safety and health and the critical factor that affects the performance of public project is cost. Future study can be done about how to control the problems of handling public project in Malaysia which is can affect the performance of public project, how these four (4) factors which are cost, time, quality, and safety and health will affect the performance of public project, and how to control the factors that affect the performance of public project.