Improving Flexibility in Manufacturing Using a Family Ordering System for Long Lead Time Component

Most manufacturers face challenges from inaccurate forecast, regular plan changes, back log and capacity problems. As a result, their purchasers rely heavily on the material suppliers to provide greater flexibility in the event of production schedule changes. Oftentimes, manufacturers attempt to pu...

Full description

Saved in:
Bibliographic Details
Main Author: Ooi, Chee Keong
Format: Thesis
Language:English
English
Published: 2005
Online Access:http://psasir.upm.edu.my/id/eprint/382/1/549751_fk_2005_32_abstrak_je__dh_pdf_.pdf
http://psasir.upm.edu.my/id/eprint/382/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Putra Malaysia
Language: English
English
Be the first to leave a comment!
You must be logged in first