Improving Flexibility in Manufacturing Using a Family Ordering System for Long Lead Time Component
Most manufacturers face challenges from inaccurate forecast, regular plan changes, back log and capacity problems. As a result, their purchasers rely heavily on the material suppliers to provide greater flexibility in the event of production schedule changes. Oftentimes, manufacturers attempt to pu...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2005
|
Online Access: | http://psasir.upm.edu.my/id/eprint/382/1/549751_fk_2005_32_abstrak_je__dh_pdf_.pdf http://psasir.upm.edu.my/id/eprint/382/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Putra Malaysia |
Language: | English English |
Be the first to leave a comment!