Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals

Increasing demand for containerization and large containerships in service compel container terminals to improve their performance. In automated container terminals (ACTs), containers are unloaded from (loaded to) the vessels, by using quay cranes (QCs). Commonly, containers are stacked in storage...

Full description

Saved in:
Bibliographic Details
Main Author: Homayouni, Seyed Mahdi
Format: Thesis
Language:English
Published: 2012
Online Access:http://psasir.upm.edu.my/id/eprint/38609/1/FK%202012%2068R.pdf
http://psasir.upm.edu.my/id/eprint/38609/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Putra Malaysia
Language: English
id my.upm.eprints.38609
record_format eprints
spelling my.upm.eprints.386092015-05-07T01:00:35Z http://psasir.upm.edu.my/id/eprint/38609/ Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals Homayouni, Seyed Mahdi Increasing demand for containerization and large containerships in service compel container terminals to improve their performance. In automated container terminals (ACTs), containers are unloaded from (loaded to) the vessels, by using quay cranes (QCs). Commonly, containers are stacked in storage yards by using automated stacking cranes (ASCs) before they delivered to final customers, or to the arriving vessels. Moreover, automated guided vehicles (AGVs) are used to connect the QCs to the storage yard. In order to increase land utilization and lower times for the storage and retrieval operations, a new storage system called split-platform automated storage/retrieval system (SP-AS/RS) has been introduced. In this system, containers are stored in racks, and two platforms are used to transfer them horizontally and vertically. Previous researches showed that integrated scheduling of handling equipment helps ACTs to improve their performance. However, there is no integrated scheduling method for QCs, AGVs, and SP-AS/RS in previous researches. In this research, the integrated scheduling is described as a multi-objective problem. A mixed integer-programming (MIP) model was developed to optimize the integrated scheduling of handling equipment with the objective function of minimizing total delays in tasks of QCs, in addition to total travel time of AGVs and platforms of the SP-AS/RS. The comparison of results for this method and an ACT in which ASCs are in use indicates that delays in tasks of QCs are reduced by 8.6%, on average. Moreover, the value of the objective function obtained by the proposed integrated scheduling method decreased 58%, on average, compared against nonintegrated scheduling method. The integrated scheduling has been proved as a nondeterministic polynomial-time hard (NP-hard) problem, which means there is no systematic approach to obtain the optimal solution especially for relatively large cases, in reasonable computation time. Therefore, two meta-heuristic algorithms, namely genetic algorithm (GA) and simulated annealing (SA) algorithm, were developed to optimize the integrated scheduling of handling equipment. The metaheuristic algorithms determine sequence of loading/unloading tasks; and a heuristic rule assigns the AGVs to the tasks. Results indicate that “earliest available vehicle” is the best heuristic rule for the integrated scheduling method. Moreover, it is shown that on average, the best objective values obtained by the GA and SA algorithm, are only 6.4% and 3.7% worse than the optimal ones found by the MIP model, respectively; demonstrating that both algorithms are able to achieve near optimal solutions. However, the GA outperforms the SA algorithm in medium and large size test cases. Sensitivity analysis shows that value of the objective function decreases as the number of available AGVs increases. Furthermore, it is revealed that to decrease delays in tasks of the QCs, the AGVs have to travel longer routes. 2012-03 Thesis NonPeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/38609/1/FK%202012%2068R.pdf Homayouni, Seyed Mahdi (2012) Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals. PhD thesis, Universiti Putra Malaysia.
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
description Increasing demand for containerization and large containerships in service compel container terminals to improve their performance. In automated container terminals (ACTs), containers are unloaded from (loaded to) the vessels, by using quay cranes (QCs). Commonly, containers are stacked in storage yards by using automated stacking cranes (ASCs) before they delivered to final customers, or to the arriving vessels. Moreover, automated guided vehicles (AGVs) are used to connect the QCs to the storage yard. In order to increase land utilization and lower times for the storage and retrieval operations, a new storage system called split-platform automated storage/retrieval system (SP-AS/RS) has been introduced. In this system, containers are stored in racks, and two platforms are used to transfer them horizontally and vertically. Previous researches showed that integrated scheduling of handling equipment helps ACTs to improve their performance. However, there is no integrated scheduling method for QCs, AGVs, and SP-AS/RS in previous researches. In this research, the integrated scheduling is described as a multi-objective problem. A mixed integer-programming (MIP) model was developed to optimize the integrated scheduling of handling equipment with the objective function of minimizing total delays in tasks of QCs, in addition to total travel time of AGVs and platforms of the SP-AS/RS. The comparison of results for this method and an ACT in which ASCs are in use indicates that delays in tasks of QCs are reduced by 8.6%, on average. Moreover, the value of the objective function obtained by the proposed integrated scheduling method decreased 58%, on average, compared against nonintegrated scheduling method. The integrated scheduling has been proved as a nondeterministic polynomial-time hard (NP-hard) problem, which means there is no systematic approach to obtain the optimal solution especially for relatively large cases, in reasonable computation time. Therefore, two meta-heuristic algorithms, namely genetic algorithm (GA) and simulated annealing (SA) algorithm, were developed to optimize the integrated scheduling of handling equipment. The metaheuristic algorithms determine sequence of loading/unloading tasks; and a heuristic rule assigns the AGVs to the tasks. Results indicate that “earliest available vehicle” is the best heuristic rule for the integrated scheduling method. Moreover, it is shown that on average, the best objective values obtained by the GA and SA algorithm, are only 6.4% and 3.7% worse than the optimal ones found by the MIP model, respectively; demonstrating that both algorithms are able to achieve near optimal solutions. However, the GA outperforms the SA algorithm in medium and large size test cases. Sensitivity analysis shows that value of the objective function decreases as the number of available AGVs increases. Furthermore, it is revealed that to decrease delays in tasks of the QCs, the AGVs have to travel longer routes.
format Thesis
author Homayouni, Seyed Mahdi
spellingShingle Homayouni, Seyed Mahdi
Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
author_facet Homayouni, Seyed Mahdi
author_sort Homayouni, Seyed Mahdi
title Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
title_short Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
title_full Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
title_fullStr Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
title_full_unstemmed Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals
title_sort development of multi-objective optimization methods for integrated scheduling of handling equipment (agvs, qcs, sp-as/rs) in automated container terminals
publishDate 2012
url http://psasir.upm.edu.my/id/eprint/38609/1/FK%202012%2068R.pdf
http://psasir.upm.edu.my/id/eprint/38609/
_version_ 1643832188172500992