Structural assessment of a proposed precast wall connection under combined loading
The industrialized building system (IBS) is defined as a construction technique in which the system components are manufactured in a controlled environment on-site or off-site, transported, positioned, and assembled into a structure with minimal additional site work. The connection of precast compon...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Online Access: | http://psasir.upm.edu.my/id/eprint/70308/1/FK%202016%2050%20IR.pdf http://psasir.upm.edu.my/id/eprint/70308/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Putra Malaysia |
Language: | English |