Service catchment of mass rapid transit (MRT) feeder bus: a preliminary study of T461 route Taman Kajang Utama

The planning and development of rail services require various considerations. Land availability, land use, catchment, route matching, infrastructure fitting, barrier free and micro-climate friendly designs are some of the factors heeded prior to such installations. A deviation between designated and...

Full description

Saved in:
Bibliographic Details
Main Authors: Aida, Chloe Lim Jhin Lin, Ponrahono, Zakiah
Format: Article
Language:English
Published: Malaysian Institute of Planners 2019
Online Access:http://psasir.upm.edu.my/id/eprint/82098/1/Simultaneous%20saccharification%20and%20fermentation%20of%20sago%20hampas%20into%20biobutanol%20by%20Clostridium%20acetobutylicum%20ATCC%20824.pdf
http://psasir.upm.edu.my/id/eprint/82098/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Putra Malaysia
Language: English
Be the first to leave a comment!
You must be logged in first