Factors Affecting The Accuracy Of Pre-tender Cost Estimates In The Gaza Strip

Pre-tender cost estimates of construction projects require extensive knowledge and expertise. The aim of this paper is to identify, evaluate and rank essential factors affecting the accuracy of pre-tender cost estimating from the perspective of clients and consultants. A survey questionnaire was...

Full description

Saved in:
Bibliographic Details
Main Authors: Enshassi, Adnan, Mohamed, Sherif, Hadi, Munther Abdel
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2013
Subjects:
Online Access:http://eprints.usm.my/42047/1/art5_jcdc18-1.pdf
http://eprints.usm.my/42047/
http://web.usm.my/jcdc/vol18_1_2013/art5_jcdc18-1.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Sains Malaysia
Language: English