Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in improving the performance of a Flexible Manufacturing System (FMS). Among the main elements in the implementation of AGV is task scheduling. This is due to the fact that efficient scheduling would enable...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/20223/1/Makespan%20Minimization%20of%20Machines%20and%20iaeng.pdf http://eprints.utem.edu.my/id/eprint/20223/ http://www.iaeng.org/publication/IMECS2010/IMECS2010_pp1897-1902.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknikal Malaysia Melaka |
Language: | English |
Summary: | An efficient and optimized Automated Guided
Vehicles (AGVs) operation plays a critical role in improving the performance of a Flexible Manufacturing System (FMS). Among the main elements in the implementation of AGV is task scheduling. This is due to the fact that efficient scheduling would enable the increment of productivity and reducing delivery cost whilst optimally utilizes the entire fleet. In this research, Binary Particle Swarm Optimization (BPSO) is used to optimize simultaneous machines and AGVs scheduling process with makespan minimization function. It is proven that the method is capable to provide better solution compared to others. |
---|