Framework for the audit process implementation on public buildings

Audit of public buildings (PBs) is a relatively new phenomenon in the construction industry in Malaysia. Until 2006, there was no such audit conducted on PBs in Malaysia. In 2007, the government, through the Public Works Department (PWD) introduced audit on all buildings owned by the federal governm...

Full description

Saved in:
Bibliographic Details
Main Author: Md Ariffin, Khadijah
Format: Thesis
Language:English
English
Published: 2015
Subjects:
Online Access:http://eprints.uthm.edu.my/1517/1/24p%20KHADIJAH%20MD%20ARIFFIN.pdf
http://eprints.uthm.edu.my/1517/2/KHADIJAH%20MD%20ARIFFIN%20WATERMARK.pdf
http://eprints.uthm.edu.my/1517/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
English
id my.uthm.eprints.1517
record_format eprints
spelling my.uthm.eprints.15172021-10-03T07:53:21Z http://eprints.uthm.edu.my/1517/ Framework for the audit process implementation on public buildings Md Ariffin, Khadijah TH Building construction Audit of public buildings (PBs) is a relatively new phenomenon in the construction industry in Malaysia. Until 2006, there was no such audit conducted on PBs in Malaysia. In 2007, the government, through the Public Works Department (PWD) introduced audit on all buildings owned by the federal government. However, no formal studies have been conducted to explore the processes involved in the audit performed by PWD. An exploratory study was conducted to identify the processes involved in the audit of PBs by PWD. The exploratory study conducted concluded that full phase of audit was not implemented by PWD. Research findings from the exploratory study identified that PWD is the only agency in Malaysia which conducts technical audit on PBs. The finding has stimulated this study to refine research questions; justify a single and holistic case study as a research approach and identify the stakeholders involved in the audit process. A framework for identifying the stakeholders involved and their tasks and expectations which lead to the requirements needed to implement full phase of audit is further developed and applied for the Batu Pahat District Health Clinic (The Clinic Building). Hence, the study aims to investigate other requirements that are needed for full phase of audit being implemented for the Clinic Building by PWD. This study explores the key stakeholders involved, and their level of involvement in the audit process; barriers for full engagement of the audit process; and the stakeholders’ expectations for the audit process that lead to the barriers and issues that arises from the audit process by PWD. This study applies qualitative research methodology with a case study design, and adopts rigorous data collection and analysis. Interviews and focus group were used as the main data collection method in obtaining the right data for the study. The data were then analysed using NVivo 2 as a tool. Research findings from the case study lead to the introduction of a framework for implementing full phase of audit on PBs for PWD. This leads to the identification of additional requirements needed for the full phase of audit on PBs by PWD. It generates new knowledge on the requirements of the full phase of an audit process on PBs in Malaysia. 2015-07 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1517/1/24p%20KHADIJAH%20MD%20ARIFFIN.pdf text en http://eprints.uthm.edu.my/1517/2/KHADIJAH%20MD%20ARIFFIN%20WATERMARK.pdf Md Ariffin, Khadijah (2015) Framework for the audit process implementation on public buildings. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
English
topic TH Building construction
spellingShingle TH Building construction
Md Ariffin, Khadijah
Framework for the audit process implementation on public buildings
description Audit of public buildings (PBs) is a relatively new phenomenon in the construction industry in Malaysia. Until 2006, there was no such audit conducted on PBs in Malaysia. In 2007, the government, through the Public Works Department (PWD) introduced audit on all buildings owned by the federal government. However, no formal studies have been conducted to explore the processes involved in the audit performed by PWD. An exploratory study was conducted to identify the processes involved in the audit of PBs by PWD. The exploratory study conducted concluded that full phase of audit was not implemented by PWD. Research findings from the exploratory study identified that PWD is the only agency in Malaysia which conducts technical audit on PBs. The finding has stimulated this study to refine research questions; justify a single and holistic case study as a research approach and identify the stakeholders involved in the audit process. A framework for identifying the stakeholders involved and their tasks and expectations which lead to the requirements needed to implement full phase of audit is further developed and applied for the Batu Pahat District Health Clinic (The Clinic Building). Hence, the study aims to investigate other requirements that are needed for full phase of audit being implemented for the Clinic Building by PWD. This study explores the key stakeholders involved, and their level of involvement in the audit process; barriers for full engagement of the audit process; and the stakeholders’ expectations for the audit process that lead to the barriers and issues that arises from the audit process by PWD. This study applies qualitative research methodology with a case study design, and adopts rigorous data collection and analysis. Interviews and focus group were used as the main data collection method in obtaining the right data for the study. The data were then analysed using NVivo 2 as a tool. Research findings from the case study lead to the introduction of a framework for implementing full phase of audit on PBs for PWD. This leads to the identification of additional requirements needed for the full phase of audit on PBs by PWD. It generates new knowledge on the requirements of the full phase of an audit process on PBs in Malaysia.
format Thesis
author Md Ariffin, Khadijah
author_facet Md Ariffin, Khadijah
author_sort Md Ariffin, Khadijah
title Framework for the audit process implementation on public buildings
title_short Framework for the audit process implementation on public buildings
title_full Framework for the audit process implementation on public buildings
title_fullStr Framework for the audit process implementation on public buildings
title_full_unstemmed Framework for the audit process implementation on public buildings
title_sort framework for the audit process implementation on public buildings
publishDate 2015
url http://eprints.uthm.edu.my/1517/1/24p%20KHADIJAH%20MD%20ARIFFIN.pdf
http://eprints.uthm.edu.my/1517/2/KHADIJAH%20MD%20ARIFFIN%20WATERMARK.pdf
http://eprints.uthm.edu.my/1517/
_version_ 1738580869732368384