A study on schedule management for BIM projects in the construction industry
There is an advance modelling tool that currently been pushed by the industry is BIM. BIM as known as Building Modelling Information is a computerized process that is used to design, understand and establish the key physical and functional characteristic of a building on a ‘virtual’ computerized mod...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Penerbit Uthm
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3536/1/10.pdf http://eprints.uthm.edu.my/3536/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English |