A study on schedule management for BIM projects in the construction industry
There is an advance modelling tool that currently been pushed by the industry is BIM. BIM as known as Building Modelling Information is a computerized process that is used to design, understand and establish the key physical and functional characteristic of a building on a ‘virtual’ computerized mod...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Penerbit Uthm
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3536/1/10.pdf http://eprints.uthm.edu.my/3536/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English |
id |
my.uthm.eprints.3536 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.35362022-01-05T07:27:58Z http://eprints.uthm.edu.my/3536/ A study on schedule management for BIM projects in the construction industry Soon Ern, Peniel Ang Ali, Roslinda Yang, Ooi Chee TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction There is an advance modelling tool that currently been pushed by the industry is BIM. BIM as known as Building Modelling Information is a computerized process that is used to design, understand and establish the key physical and functional characteristic of a building on a ‘virtual’ computerized model basis at its most basic level [4]. Basically the resulting model is a digital representation of the building which the data can be extracted and analyzed to generate information that can be used for decision making and enhance the process of delivering the building and the entire life cycle use of the building [4]. BIM implementation can help to improve the quality of project especially the schedule management. By implementing BIM into construction project, it can provides schedule visualization which can make the construction planning more efficient. Besides that, through the BIM model clash detection can be detected in the preconstruction phase which save a lot of time on rework during construction phase. Penerbit Uthm 2018 Book Section PeerReviewed text en http://eprints.uthm.edu.my/3536/1/10.pdf Soon Ern, Peniel Ang and Ali, Roslinda and Yang, Ooi Chee (2018) A study on schedule management for BIM projects in the construction industry. In: Construction Materials and Technology Series. Penerbit Uthm, Uthm, pp. 139-150. ISBN 978-967-2183-19-8 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction |
spellingShingle |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Soon Ern, Peniel Ang Ali, Roslinda Yang, Ooi Chee A study on schedule management for BIM projects in the construction industry |
description |
There is an advance modelling tool that currently been pushed by the industry is BIM. BIM as known as Building Modelling Information is a computerized process that is used to design, understand and establish the key physical and functional characteristic of a building on a ‘virtual’ computerized model basis at its most basic level [4]. Basically the resulting model is a digital representation of the building which the data can be extracted and analyzed to generate information that can be used for decision making and enhance the process of delivering the building and the entire life cycle use of the building [4]. BIM implementation can help to improve the quality of project especially the schedule management. By implementing BIM into construction project, it can provides schedule visualization which can make the construction planning more efficient. Besides that, through the BIM model clash detection can be detected in the preconstruction phase which save a lot of time on rework during construction phase. |
format |
Book Section |
author |
Soon Ern, Peniel Ang Ali, Roslinda Yang, Ooi Chee |
author_facet |
Soon Ern, Peniel Ang Ali, Roslinda Yang, Ooi Chee |
author_sort |
Soon Ern, Peniel Ang |
title |
A study on schedule management for BIM projects in the construction industry |
title_short |
A study on schedule management for BIM projects in the construction industry |
title_full |
A study on schedule management for BIM projects in the construction industry |
title_fullStr |
A study on schedule management for BIM projects in the construction industry |
title_full_unstemmed |
A study on schedule management for BIM projects in the construction industry |
title_sort |
study on schedule management for bim projects in the construction industry |
publisher |
Penerbit Uthm |
publishDate |
2018 |
url |
http://eprints.uthm.edu.my/3536/1/10.pdf http://eprints.uthm.edu.my/3536/ |
_version_ |
1738581135802236928 |