Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects
The construction industry is one of the world’s fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple co...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Mdpi
2023
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/8960/1/J15955_c560d0c29dcf56f1ad961756d616405b.pdf http://eprints.uthm.edu.my/8960/ https://doi.org/10.3390/su15075872 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English |
id |
my.uthm.eprints.8960 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.89602023-06-18T01:37:37Z http://eprints.uthm.edu.my/8960/ Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects Khahro, Shabir Hussain Shaikh, Haseeb Haleem Zainun, Noor Yasmin Sultan, Basel Khahro, Qasim Hussain T Technology (General) The construction industry is one of the world’s fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple consequences on project performance. Consequently, the purpose of this study was to identify the primary causes of delayed decision-making and offer a decision support model for timely construction project decisions. For factor identification, a comprehensive literature analysis was conducted, followed by an analysis of questionnaire responses of ninety-one professionals. For data analysis, the relative importance index (RII) method was applied. The results indicate that client decision-making delays pose a substantial obstacle for building projects. The early decision-making process is impacted by a lack of technical competence, incomplete paperwork, poor leadership, and coordination/communication issues. The proposed model could also assist project practitioners in improving their project decision making. This research study encourages stakeholders to create and implement an efficient decision-making procedure for timely project decisions. A procedure for decision making that is successful could decrease delays in the decision-making process and prevent conflicts and disputes in projects. Mdpi 2023 Article PeerReviewed text en http://eprints.uthm.edu.my/8960/1/J15955_c560d0c29dcf56f1ad961756d616405b.pdf Khahro, Shabir Hussain and Shaikh, Haseeb Haleem and Zainun, Noor Yasmin and Sultan, Basel and Khahro, Qasim Hussain (2023) Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects. Sustainability, 15 (5872). pp. 1-22. https://doi.org/10.3390/su15075872 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Khahro, Shabir Hussain Shaikh, Haseeb Haleem Zainun, Noor Yasmin Sultan, Basel Khahro, Qasim Hussain Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects |
description |
The construction industry is one of the world’s fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple
consequences on project performance. Consequently, the purpose of this study was to identify the primary causes of delayed decision-making and offer a decision support model for timely construction project decisions. For factor identification, a comprehensive literature analysis was
conducted, followed by an analysis of questionnaire responses of ninety-one professionals. For data analysis, the relative importance index (RII) method was applied. The results indicate that client decision-making delays pose a substantial obstacle for building projects. The early decision-making process is impacted by a lack of technical competence, incomplete paperwork, poor leadership, and
coordination/communication issues. The proposed model could also assist project practitioners in improving their project decision making. This research study encourages stakeholders to create and implement an efficient decision-making procedure for timely project decisions. A procedure for decision making that is successful could decrease delays in the decision-making process and prevent conflicts and disputes in projects. |
format |
Article |
author |
Khahro, Shabir Hussain Shaikh, Haseeb Haleem Zainun, Noor Yasmin Sultan, Basel Khahro, Qasim Hussain |
author_facet |
Khahro, Shabir Hussain Shaikh, Haseeb Haleem Zainun, Noor Yasmin Sultan, Basel Khahro, Qasim Hussain |
author_sort |
Khahro, Shabir Hussain |
title |
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects |
title_short |
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects |
title_full |
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects |
title_fullStr |
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects |
title_full_unstemmed |
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects |
title_sort |
delay in decision-making affecting construction projects:
a sustainable decision-making model for mega projects |
publisher |
Mdpi |
publishDate |
2023 |
url |
http://eprints.uthm.edu.my/8960/1/J15955_c560d0c29dcf56f1ad961756d616405b.pdf http://eprints.uthm.edu.my/8960/ https://doi.org/10.3390/su15075872 |
_version_ |
1769845119180079104 |