Productivity rate of roof works for JKR school project scheduling
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/16643/ http://libraryopac.utm.my/client/en_AU/main/search/results?qu=Productivity+rate+of+roof+works+for+JKR+school+project+scheduling&te= |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.16643 |
---|---|
record_format |
eprints |
spelling |
my.utm.166432017-09-26T07:17:25Z http://eprints.utm.my/id/eprint/16643/ Productivity rate of roof works for JKR school project scheduling Rijal , Zuraida Zaini TA Engineering (General). Civil engineering (General) 2010 Thesis NonPeerReviewed Rijal , Zuraida Zaini (2010) Productivity rate of roof works for JKR school project scheduling. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://libraryopac.utm.my/client/en_AU/main/search/results?qu=Productivity+rate+of+roof+works+for+JKR+school+project+scheduling&te= |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Rijal , Zuraida Zaini Productivity rate of roof works for JKR school project scheduling |
format |
Thesis |
author |
Rijal , Zuraida Zaini |
author_facet |
Rijal , Zuraida Zaini |
author_sort |
Rijal , Zuraida Zaini |
title |
Productivity rate of roof works for JKR school project scheduling |
title_short |
Productivity rate of roof works for JKR school project scheduling |
title_full |
Productivity rate of roof works for JKR school project scheduling |
title_fullStr |
Productivity rate of roof works for JKR school project scheduling |
title_full_unstemmed |
Productivity rate of roof works for JKR school project scheduling |
title_sort |
productivity rate of roof works for jkr school project scheduling |
publishDate |
2010 |
url |
http://eprints.utm.my/id/eprint/16643/ http://libraryopac.utm.my/client/en_AU/main/search/results?qu=Productivity+rate+of+roof+works+for+JKR+school+project+scheduling&te= |
_version_ |
1643646619528200192 |