Optimization of pipe spool fabrication shop scheduling using genetic algorithm

Spool fabrication shop is an intermediate phase in the piping process for construction projects. The delivery of pipe spools at the right time in order to be installed in the site, is very important. Therefore, effective scheduling and control of the fabrication shop has a direct effect on the produ...

Full description

Saved in:
Bibliographic Details
Main Author: Moghadam, Ali Mokhtari
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33816/5/AliMokhtariMoghadamMFKM2013.pdf
http://eprints.utm.my/id/eprint/33816/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English