Concrete chimney demolition methods (case study: Perai TNB power station chimney)
Saved in:
Main Author: | |
---|---|
Format: | Conference or Workshop Item |
Published: |
2011
|
Online Access: | http://eprints.utm.my/id/eprint/45694/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.45694 |
---|---|
record_format |
eprints |
spelling |
my.utm.456942017-08-23T01:52:44Z http://eprints.utm.my/id/eprint/45694/ Concrete chimney demolition methods (case study: Perai TNB power station chimney) Abdullah, Arham 2011 Conference or Workshop Item PeerReviewed Abdullah, Arham (2011) Concrete chimney demolition methods (case study: Perai TNB power station chimney). In: 1st International Construction Business & Management Symposium 2011. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
format |
Conference or Workshop Item |
author |
Abdullah, Arham |
spellingShingle |
Abdullah, Arham Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
author_facet |
Abdullah, Arham |
author_sort |
Abdullah, Arham |
title |
Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
title_short |
Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
title_full |
Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
title_fullStr |
Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
title_full_unstemmed |
Concrete chimney demolition methods (case study: Perai TNB power station chimney) |
title_sort |
concrete chimney demolition methods (case study: perai tnb power station chimney) |
publishDate |
2011 |
url |
http://eprints.utm.my/id/eprint/45694/ |
_version_ |
1643651815840940032 |