Document management in construction for shorter project lead time using web-based software
The efficiency improvement of construction projects depends on the effective communication among the project participants. However, the problem of communication occurs due to high amount and variety of information during the construction process. Thus, this study aims at applying Microsoft Office Gr...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/50994/ https://www.researchgate.net/publication/268467531_Document_Management_in_Construction_for_Shorter_Project_Lead_Time_Using_Web-Based_Software |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.50994 |
---|---|
record_format |
eprints |
spelling |
my.utm.509942017-06-29T06:29:05Z http://eprints.utm.my/id/eprint/50994/ Document management in construction for shorter project lead time using web-based software Wong, Kuan Yew Nikakhtar, Amin Zarebidaki, Ali TJ Mechanical engineering and machinery The efficiency improvement of construction projects depends on the effective communication among the project participants. However, the problem of communication occurs due to high amount and variety of information during the construction process. Thus, this study aims at applying Microsoft Office Groove as a method for reducing construction lead time and facilitating document management at the construction site. Lead times of the new method were compared with those of the conventional method of documentation in construction. Reduction in delivery time and lead time of the documentation process and improvement in communication between constructions participants are observed as the results of implementing the proposed method. 2013 Conference or Workshop Item PeerReviewed Wong, Kuan Yew and Nikakhtar, Amin and Zarebidaki, Ali (2013) Document management in construction for shorter project lead time using web-based software. In: ICSDEC 2012: Developing the Frontier of Sustainable Design, Engineering, and Construction - Proceedings of the 2012 International Conference on Sustainable Design and Construction. https://www.researchgate.net/publication/268467531_Document_Management_in_Construction_for_Shorter_Project_Lead_Time_Using_Web-Based_Software |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Wong, Kuan Yew Nikakhtar, Amin Zarebidaki, Ali Document management in construction for shorter project lead time using web-based software |
description |
The efficiency improvement of construction projects depends on the effective communication among the project participants. However, the problem of communication occurs due to high amount and variety of information during the construction process. Thus, this study aims at applying Microsoft Office Groove as a method for reducing construction lead time and facilitating document management at the construction site. Lead times of the new method were compared with those of the conventional method of documentation in construction. Reduction in delivery time and lead time of the documentation process and improvement in communication between constructions participants are observed as the results of implementing the proposed method. |
format |
Conference or Workshop Item |
author |
Wong, Kuan Yew Nikakhtar, Amin Zarebidaki, Ali |
author_facet |
Wong, Kuan Yew Nikakhtar, Amin Zarebidaki, Ali |
author_sort |
Wong, Kuan Yew |
title |
Document management in construction for shorter project lead time using web-based software |
title_short |
Document management in construction for shorter project lead time using web-based software |
title_full |
Document management in construction for shorter project lead time using web-based software |
title_fullStr |
Document management in construction for shorter project lead time using web-based software |
title_full_unstemmed |
Document management in construction for shorter project lead time using web-based software |
title_sort |
document management in construction for shorter project lead time using web-based software |
publishDate |
2013 |
url |
http://eprints.utm.my/id/eprint/50994/ https://www.researchgate.net/publication/268467531_Document_Management_in_Construction_for_Shorter_Project_Lead_Time_Using_Web-Based_Software |
_version_ |
1643652907340398592 |