Novation agreement in design and build contracts

In the current market of Malaysia construction industry and among its players, the term ‘design and build’ is no longer require a proper launch as it has been in the implementation since the late 90’s. However, the term ‘novation agreement’ in the design and build definitely requires a lon...

Full description

Saved in:
Bibliographic Details
Main Author: Sahil, Natasha
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.utm.my/id/eprint/5908/1/NatashaSahilMFGHT2008.pdf
http://eprints.utm.my/id/eprint/5908/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:1327
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.5908
record_format eprints
spelling my.utm.59082018-10-14T07:19:39Z http://eprints.utm.my/id/eprint/5908/ Novation agreement in design and build contracts Sahil, Natasha GE Environmental Sciences In the current market of Malaysia construction industry and among its players, the term ‘design and build’ is no longer require a proper launch as it has been in the implementation since the late 90’s. However, the term ‘novation agreement’ in the design and build definitely requires a long and detail explanation. This is of course a new exercise in the local industry implemented massively by the semi-government holding company being the developer for a development of a territory. The implementation which grants the advantage on the part of the developer due to its mechanism has attracted other private employers to implement the same. This is because the traditional system has been revolutionized. Apart from providing single point responsibility by the procurement system, the employer can also take fully charge of the design prior to the tender stage and transfers his whole burden under the project to the contractor which includes employer’s design team. This total litigious arrangement if not being properly monitored will produce arising numbers of contractual disputes and arbitration cases. Rights of contractors and design teams seemed not to be catered for in the novation agreement due to the bespoke agreement drafted in project to project basis by the employer’s contract drafters. Protection to the interest of the contractor and consultant is to be attained. Therefore, the objective of this research is to identify the feasible contractual solutions to the implementation of novation agreement in design and build in order to suit the requirement and the intention of the employer and at the same time to ensure the impartiality of the rights and obligation of the contracting parties. The scope of this research is confined under the design and build system implemented in Malaysia and in UK. The methodology of this research adopts from literature review together with the conduction of semi-structure interviews with various construction professionals. As a conclusion with this research, the probable solutions shall be either the institution of the Malaysia standard form of novation agreement or warranty furnished by the design team on pre-novation breaches, supplementary agreement to the novation agreement or the change in the methodology where the contractor is allowed to step in earlier during the design stage. 2008-07 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/5908/1/NatashaSahilMFGHT2008.pdf Sahil, Natasha (2008) Novation agreement in design and build contracts. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation Science and Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:1327
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic GE Environmental Sciences
spellingShingle GE Environmental Sciences
Sahil, Natasha
Novation agreement in design and build contracts
description In the current market of Malaysia construction industry and among its players, the term ‘design and build’ is no longer require a proper launch as it has been in the implementation since the late 90’s. However, the term ‘novation agreement’ in the design and build definitely requires a long and detail explanation. This is of course a new exercise in the local industry implemented massively by the semi-government holding company being the developer for a development of a territory. The implementation which grants the advantage on the part of the developer due to its mechanism has attracted other private employers to implement the same. This is because the traditional system has been revolutionized. Apart from providing single point responsibility by the procurement system, the employer can also take fully charge of the design prior to the tender stage and transfers his whole burden under the project to the contractor which includes employer’s design team. This total litigious arrangement if not being properly monitored will produce arising numbers of contractual disputes and arbitration cases. Rights of contractors and design teams seemed not to be catered for in the novation agreement due to the bespoke agreement drafted in project to project basis by the employer’s contract drafters. Protection to the interest of the contractor and consultant is to be attained. Therefore, the objective of this research is to identify the feasible contractual solutions to the implementation of novation agreement in design and build in order to suit the requirement and the intention of the employer and at the same time to ensure the impartiality of the rights and obligation of the contracting parties. The scope of this research is confined under the design and build system implemented in Malaysia and in UK. The methodology of this research adopts from literature review together with the conduction of semi-structure interviews with various construction professionals. As a conclusion with this research, the probable solutions shall be either the institution of the Malaysia standard form of novation agreement or warranty furnished by the design team on pre-novation breaches, supplementary agreement to the novation agreement or the change in the methodology where the contractor is allowed to step in earlier during the design stage.
format Thesis
author Sahil, Natasha
author_facet Sahil, Natasha
author_sort Sahil, Natasha
title Novation agreement in design and build contracts
title_short Novation agreement in design and build contracts
title_full Novation agreement in design and build contracts
title_fullStr Novation agreement in design and build contracts
title_full_unstemmed Novation agreement in design and build contracts
title_sort novation agreement in design and build contracts
publishDate 2008
url http://eprints.utm.my/id/eprint/5908/1/NatashaSahilMFGHT2008.pdf
http://eprints.utm.my/id/eprint/5908/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:1327
_version_ 1643644431918694400