Determining the causes of delay by using factor analysis in Tehran’s construction projects
Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. By considering all viewpoints of the parties, this research identified the most effective and severe causes of delay in construction projects in the Capital o...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/60641/ https://www.scientific.net/AMM.735.109 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.60641 |
---|---|
record_format |
eprints |
spelling |
my.utm.606412017-08-20T07:39:45Z http://eprints.utm.my/id/eprint/60641/ Determining the causes of delay by using factor analysis in Tehran’s construction projects Rafieizonooz, Mahdi Salim, Mohd. Razman Khankhaje, Elnaz Hussin, Mohd. Warid Zarebidaki, Ali Salmiati, Salmiati TH Building construction Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. By considering all viewpoints of the parties, this research identified the most effective and severe causes of delay in construction projects in the Capital of Iran, Tehran. Questionnaires were distributed among respondents who are involved in the construction project in Tehran. The process of data analysis and discussions were conducted based on the two statistical techniques namely descriptive analysis (RII) and factor analysis. Using factor analysis, most critical factors of Tehran’s construction delay were recognized as: (1) lack of commitment; (2) inefficient site management; (3) poor site coordination; (4) Complexity in heritage and legislation; (5) Lack of estimation skills and skilled workers; (6) Lack of communication between parties; (7) Improper planning; and (8) Lack of clarity in contract. These results are anticipated to be important contributions to construction projects in Tehran in controlling the time overruns in construction contracts. 2015 Conference or Workshop Item PeerReviewed Rafieizonooz, Mahdi and Salim, Mohd. Razman and Khankhaje, Elnaz and Hussin, Mohd. Warid and Zarebidaki, Ali and Salmiati, Salmiati (2015) Determining the causes of delay by using factor analysis in Tehran’s construction projects. In: Applied Mechanics and Material, 2015. https://www.scientific.net/AMM.735.109 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TH Building construction |
spellingShingle |
TH Building construction Rafieizonooz, Mahdi Salim, Mohd. Razman Khankhaje, Elnaz Hussin, Mohd. Warid Zarebidaki, Ali Salmiati, Salmiati Determining the causes of delay by using factor analysis in Tehran’s construction projects |
description |
Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. By considering all viewpoints of the parties, this research identified the most effective and severe causes of delay in construction projects in the Capital of Iran, Tehran. Questionnaires were distributed among respondents who are involved in the construction project in Tehran. The process of data analysis and discussions were conducted based on the two statistical techniques namely descriptive analysis (RII) and factor analysis. Using factor analysis, most critical factors of Tehran’s construction delay were recognized as: (1) lack of commitment; (2) inefficient site management; (3) poor site coordination; (4) Complexity in heritage and legislation; (5) Lack of estimation skills and skilled workers; (6) Lack of communication between parties; (7) Improper planning; and (8) Lack of clarity in contract. These results are anticipated to be important contributions to construction projects in Tehran in controlling the time overruns in construction contracts. |
format |
Conference or Workshop Item |
author |
Rafieizonooz, Mahdi Salim, Mohd. Razman Khankhaje, Elnaz Hussin, Mohd. Warid Zarebidaki, Ali Salmiati, Salmiati |
author_facet |
Rafieizonooz, Mahdi Salim, Mohd. Razman Khankhaje, Elnaz Hussin, Mohd. Warid Zarebidaki, Ali Salmiati, Salmiati |
author_sort |
Rafieizonooz, Mahdi |
title |
Determining the causes of delay by using factor analysis in Tehran’s construction projects |
title_short |
Determining the causes of delay by using factor analysis in Tehran’s construction projects |
title_full |
Determining the causes of delay by using factor analysis in Tehran’s construction projects |
title_fullStr |
Determining the causes of delay by using factor analysis in Tehran’s construction projects |
title_full_unstemmed |
Determining the causes of delay by using factor analysis in Tehran’s construction projects |
title_sort |
determining the causes of delay by using factor analysis in tehran’s construction projects |
publishDate |
2015 |
url |
http://eprints.utm.my/id/eprint/60641/ https://www.scientific.net/AMM.735.109 |
_version_ |
1643654933192376320 |