Project managers’ knowledge management and competency model for construction in Malaysia

The construction industry in Malaysia plays a critical role in its economic development. However, this sector suffers frequent problems, including time and cost overrun, low quality, and poor performance and productivity. One of the critical factors leading to these problems is the incompetent proje...

全面介紹

Saved in:
書目詳細資料
主要作者: Hashim, Elmahdee M. A. B. A.
格式: Thesis
語言:English
出版: 2016
主題:
在線閱讀:http://eprints.utm.my/id/eprint/79282/1/ElmahdeePSPS2016.pdf
http://eprints.utm.my/id/eprint/79282/
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Universiti Teknologi Malaysia
語言: English
id my.utm.79282
record_format eprints
spelling my.utm.792822018-10-14T08:41:57Z http://eprints.utm.my/id/eprint/79282/ Project managers’ knowledge management and competency model for construction in Malaysia Hashim, Elmahdee M. A. B. A. HD28 Management. Industrial Management The construction industry in Malaysia plays a critical role in its economic development. However, this sector suffers frequent problems, including time and cost overrun, low quality, and poor performance and productivity. One of the critical factors leading to these problems is the incompetent project managers who lead and execute projects. This study investigated the role of the knowledge management approach in improving project managers' competencies through testing the relationship between knowledge management (KM) and project managers' competencies (PMC). Despite the direct linkage between knowledge management and competencies, literature rarely shows a model that presents this direct relationship, particularly in the construction industry. This study applied a quantitative method using an online survey for data collection. The target respondents were project managers in construction companies in Malaysia. The questionnaire was distributed to randomly selected 480 construction companies from the CIDB website. A total number of 227 completed responses were collected from 181 companies. The data was analyzed using descriptive analysis, a reliability test, and exploratory factor analysis using SPSS software. However, the research model and research hypotheses were tested through structural equation modeling (SEM) using AMOS software. The results of the descriptive analysis indicated that the application of knowledge management in Malaysian construction companies is modest. Also, the findings indicated that knowledge management has a positive causal effect on project managers' competencies. The KM-PMC model developed in this study capable for predicting and improving project managers’ competencies using the knowledge management approach. As this study is limited to the direct effect of knowledge management on project managers’ competencies, future research may explore the mediator factors that affect relationships within the KM-PMC model. 2016 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79282/1/ElmahdeePSPS2016.pdf Hashim, Elmahdee M. A. B. A. (2016) Project managers’ knowledge management and competency model for construction in Malaysia. PhD thesis, Universiti Teknologi Malaysia, School of Graduate Studies.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Hashim, Elmahdee M. A. B. A.
Project managers’ knowledge management and competency model for construction in Malaysia
description The construction industry in Malaysia plays a critical role in its economic development. However, this sector suffers frequent problems, including time and cost overrun, low quality, and poor performance and productivity. One of the critical factors leading to these problems is the incompetent project managers who lead and execute projects. This study investigated the role of the knowledge management approach in improving project managers' competencies through testing the relationship between knowledge management (KM) and project managers' competencies (PMC). Despite the direct linkage between knowledge management and competencies, literature rarely shows a model that presents this direct relationship, particularly in the construction industry. This study applied a quantitative method using an online survey for data collection. The target respondents were project managers in construction companies in Malaysia. The questionnaire was distributed to randomly selected 480 construction companies from the CIDB website. A total number of 227 completed responses were collected from 181 companies. The data was analyzed using descriptive analysis, a reliability test, and exploratory factor analysis using SPSS software. However, the research model and research hypotheses were tested through structural equation modeling (SEM) using AMOS software. The results of the descriptive analysis indicated that the application of knowledge management in Malaysian construction companies is modest. Also, the findings indicated that knowledge management has a positive causal effect on project managers' competencies. The KM-PMC model developed in this study capable for predicting and improving project managers’ competencies using the knowledge management approach. As this study is limited to the direct effect of knowledge management on project managers’ competencies, future research may explore the mediator factors that affect relationships within the KM-PMC model.
format Thesis
author Hashim, Elmahdee M. A. B. A.
author_facet Hashim, Elmahdee M. A. B. A.
author_sort Hashim, Elmahdee M. A. B. A.
title Project managers’ knowledge management and competency model for construction in Malaysia
title_short Project managers’ knowledge management and competency model for construction in Malaysia
title_full Project managers’ knowledge management and competency model for construction in Malaysia
title_fullStr Project managers’ knowledge management and competency model for construction in Malaysia
title_full_unstemmed Project managers’ knowledge management and competency model for construction in Malaysia
title_sort project managers’ knowledge management and competency model for construction in malaysia
publishDate 2016
url http://eprints.utm.my/id/eprint/79282/1/ElmahdeePSPS2016.pdf
http://eprints.utm.my/id/eprint/79282/
_version_ 1643658150263390208