Risk assessment plan for Johor port contingent threats

The issue of safety and security of marine transportation is a major concern and very critical because it is related with the import and export business in port terminal. As a critical asset that hardly can be substituted by other assets, port terminal requires an effective and comprehensive protect...

Full description

Saved in:
Bibliographic Details
Main Author: Hamzah, Ezdihar
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/79284/1/EzdiharHamzahPFGHT2018.pdf
http://eprints.utm.my/id/eprint/79284/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.79284
record_format eprints
spelling my.utm.792842018-10-14T08:41:58Z http://eprints.utm.my/id/eprint/79284/ Risk assessment plan for Johor port contingent threats Hamzah, Ezdihar G70.212-70.215 Geographic information system The issue of safety and security of marine transportation is a major concern and very critical because it is related with the import and export business in port terminal. As a critical asset that hardly can be substituted by other assets, port terminal requires an effective and comprehensive protection plan to ensure its stability during contingent threats. Risk management process contributes in emergency response protection plan for critical assets during contingent threats. However, there are gaps in risk management process because the critical assets need the resilient elements to retain its original state if threats occur. Thus, the first objective of this research is to investigate and analyse the key risk factors for port terminal. Secondly, to identify and analyse the risk management process for port terminal. Thirdly, to investigate and assess the relationship between resilient indicators in risk management. Fourthly, to develop a structural model of relationship between resilient indicators in risk assessment plan for port resilience emergency plan. The research methodology applied in this research is based on quantitative method with questionnaire survey approach. A preliminary interview with the experts was carried out to validate the questionnaire. Questionnaires are distributed among 75 members from PAGEMA (Pasir Gudang Emergency Mutual Aid). The respondents were chosen among selected group of people that are the vendors for Johor Port representing private and government sectors. The response rate are 72%. The analysis methods used in this research include descriptive analysis, Relative Importance Index (RII) analysis and Structural Equation Model–Partial Least Squares (SEM-PLS). The research findings show the significance level and significance index to each element in risk management process and resilient indicators. Finally, this research have produced a final model of risk assessment plan with six resilience elements and twenty nine indicators. Communication, relationships and planning strategies are the most significant contributors in resilient elements. The combination of significant contributors in resilient elements are an added value to the risk assessment plan. This research also contributes to the methodology in terms of application of risk matrix in investigating and analysing the key risk factors. This research contributes to the emergency response committee in terms of resilient elements justification and their significance in risk management process. 2018 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79284/1/EzdiharHamzahPFGHT2018.pdf Hamzah, Ezdihar (2018) Risk assessment plan for Johor port contingent threats. PhD thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic G70.212-70.215 Geographic information system
spellingShingle G70.212-70.215 Geographic information system
Hamzah, Ezdihar
Risk assessment plan for Johor port contingent threats
description The issue of safety and security of marine transportation is a major concern and very critical because it is related with the import and export business in port terminal. As a critical asset that hardly can be substituted by other assets, port terminal requires an effective and comprehensive protection plan to ensure its stability during contingent threats. Risk management process contributes in emergency response protection plan for critical assets during contingent threats. However, there are gaps in risk management process because the critical assets need the resilient elements to retain its original state if threats occur. Thus, the first objective of this research is to investigate and analyse the key risk factors for port terminal. Secondly, to identify and analyse the risk management process for port terminal. Thirdly, to investigate and assess the relationship between resilient indicators in risk management. Fourthly, to develop a structural model of relationship between resilient indicators in risk assessment plan for port resilience emergency plan. The research methodology applied in this research is based on quantitative method with questionnaire survey approach. A preliminary interview with the experts was carried out to validate the questionnaire. Questionnaires are distributed among 75 members from PAGEMA (Pasir Gudang Emergency Mutual Aid). The respondents were chosen among selected group of people that are the vendors for Johor Port representing private and government sectors. The response rate are 72%. The analysis methods used in this research include descriptive analysis, Relative Importance Index (RII) analysis and Structural Equation Model–Partial Least Squares (SEM-PLS). The research findings show the significance level and significance index to each element in risk management process and resilient indicators. Finally, this research have produced a final model of risk assessment plan with six resilience elements and twenty nine indicators. Communication, relationships and planning strategies are the most significant contributors in resilient elements. The combination of significant contributors in resilient elements are an added value to the risk assessment plan. This research also contributes to the methodology in terms of application of risk matrix in investigating and analysing the key risk factors. This research contributes to the emergency response committee in terms of resilient elements justification and their significance in risk management process.
format Thesis
author Hamzah, Ezdihar
author_facet Hamzah, Ezdihar
author_sort Hamzah, Ezdihar
title Risk assessment plan for Johor port contingent threats
title_short Risk assessment plan for Johor port contingent threats
title_full Risk assessment plan for Johor port contingent threats
title_fullStr Risk assessment plan for Johor port contingent threats
title_full_unstemmed Risk assessment plan for Johor port contingent threats
title_sort risk assessment plan for johor port contingent threats
publishDate 2018
url http://eprints.utm.my/id/eprint/79284/1/EzdiharHamzahPFGHT2018.pdf
http://eprints.utm.my/id/eprint/79284/
_version_ 1643658150860029952