Improving cost and time control in construction using building information model (Bim): A review

The control of cost and time in construction projects is one of the most important issues in construction since the emergence of the construction industry. A successful project should meet not only quality output standards, but also time and budget objectives. The management and control of cost and...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhammad Tahir, Muhammad, Haron, Nuzul Azam, Harun, Aizul Nahar, Muhammad, Isa Bala, Baba, Dorothy L.
Format: Article
Published: Universiti Putra Malaysia Press 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/85349/
http://psasir.upm.edu.my/id/eprint/59591/1/02%20JST-0745-2016-3rdProof.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.85349
record_format eprints
spelling my.utm.853492020-03-17T08:25:00Z http://eprints.utm.my/id/eprint/85349/ Improving cost and time control in construction using building information model (Bim): A review Muhammad Tahir, Muhammad Haron, Nuzul Azam Harun, Aizul Nahar Muhammad, Isa Bala Baba, Dorothy L. T Technology (General) The control of cost and time in construction projects is one of the most important issues in construction since the emergence of the construction industry. A successful project should meet not only quality output standards, but also time and budget objectives. The management and control of cost and time in construction is fundamental in every project. An effective cost and time management and control technique for construction projects is important in managing risk of cost overrun and delay in completion of projects. Construction projects are becoming more complex as they now involve many stakeholders from different disciplines. The emergence of Building Information Model (BIM), an alternative technology is believed to solve issues related to project cost and time control as it efficiently increases collaboration between stakeholders. The aim of this paper is to review and summarise the causes of delay and cost overrun in construction industries, which are the main causes of disputes and abandonment of projects in the industry. It was found that delays and cost overrun eat deep into the industry and leave the construction industry with a bad image for decades even with rapid advancement in technology. The review of the applications of BIM showed that most of the applications are geared towards minimising construction cost and time spent on projects. This means that the use of BIM in the management of construction projects has great impact on project cost and time. Universiti Putra Malaysia Press 2018-01 Article PeerReviewed Muhammad Tahir, Muhammad and Haron, Nuzul Azam and Harun, Aizul Nahar and Muhammad, Isa Bala and Baba, Dorothy L. (2018) Improving cost and time control in construction using building information model (Bim): A review. Pertanika Journal of Science and Technology, 26 (1). pp. 21-36. ISSN 0128-7680 http://psasir.upm.edu.my/id/eprint/59591/1/02%20JST-0745-2016-3rdProof.pdf
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic T Technology (General)
spellingShingle T Technology (General)
Muhammad Tahir, Muhammad
Haron, Nuzul Azam
Harun, Aizul Nahar
Muhammad, Isa Bala
Baba, Dorothy L.
Improving cost and time control in construction using building information model (Bim): A review
description The control of cost and time in construction projects is one of the most important issues in construction since the emergence of the construction industry. A successful project should meet not only quality output standards, but also time and budget objectives. The management and control of cost and time in construction is fundamental in every project. An effective cost and time management and control technique for construction projects is important in managing risk of cost overrun and delay in completion of projects. Construction projects are becoming more complex as they now involve many stakeholders from different disciplines. The emergence of Building Information Model (BIM), an alternative technology is believed to solve issues related to project cost and time control as it efficiently increases collaboration between stakeholders. The aim of this paper is to review and summarise the causes of delay and cost overrun in construction industries, which are the main causes of disputes and abandonment of projects in the industry. It was found that delays and cost overrun eat deep into the industry and leave the construction industry with a bad image for decades even with rapid advancement in technology. The review of the applications of BIM showed that most of the applications are geared towards minimising construction cost and time spent on projects. This means that the use of BIM in the management of construction projects has great impact on project cost and time.
format Article
author Muhammad Tahir, Muhammad
Haron, Nuzul Azam
Harun, Aizul Nahar
Muhammad, Isa Bala
Baba, Dorothy L.
author_facet Muhammad Tahir, Muhammad
Haron, Nuzul Azam
Harun, Aizul Nahar
Muhammad, Isa Bala
Baba, Dorothy L.
author_sort Muhammad Tahir, Muhammad
title Improving cost and time control in construction using building information model (Bim): A review
title_short Improving cost and time control in construction using building information model (Bim): A review
title_full Improving cost and time control in construction using building information model (Bim): A review
title_fullStr Improving cost and time control in construction using building information model (Bim): A review
title_full_unstemmed Improving cost and time control in construction using building information model (Bim): A review
title_sort improving cost and time control in construction using building information model (bim): a review
publisher Universiti Putra Malaysia Press
publishDate 2018
url http://eprints.utm.my/id/eprint/85349/
http://psasir.upm.edu.my/id/eprint/59591/1/02%20JST-0745-2016-3rdProof.pdf
_version_ 1662754386891243520