Review on Uncertainties Causing Time and Cost Overrun in Construction Projects

In order to plan and manage a successful project, the three parameters of time, cost and quality should be considered. The clients in the construction industry are primarily concerned with quality, time and cost. But majority of construction projects are procured on the basis of only two constr...

Full description

Saved in:
Bibliographic Details
Main Authors: B. Idrus, Arazi, Sambu Potty, Narayanan, C.T, Ramanathan
Format: Other
Published: WASET 2011
Subjects:
Online Access:http://eprints.utp.edu.my/6733/1/waset_thailand_rama.pdf
http://eprints.utp.edu.my/6733/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas