Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by us...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
School of Engineering, Taylor’s University
2014
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/10608/1/MNMN.pdf http://repo.uum.edu.my/10608/ http://jestec.taylors.edu.my/V9Issue1.htm |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.10608 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.106082016-04-18T03:08:11Z http://repo.uum.edu.my/10608/ Fragmentation issue in Malaysian Industrialised Building System (IBS) projects Mohd Nawi, Mohd Nasrun Lee, Angela Noor, Mohamed Azman, Azhari Mohamad Kamar, Kamarul Anuar TH Building construction As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach.This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a numb er of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded. School of Engineering, Taylor’s University 2014-02 Article PeerReviewed application/pdf en http://repo.uum.edu.my/10608/1/MNMN.pdf Mohd Nawi, Mohd Nasrun and Lee, Angela and Noor, Mohamed and Azman, Azhari and Mohamad Kamar, Kamarul Anuar (2014) Fragmentation issue in Malaysian Industrialised Building System (IBS) projects. Journal of Engineering Science and Technology, 9 (1). pp. 97-106. ISSN 1823-4690 http://jestec.taylors.edu.my/V9Issue1.htm |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Mohd Nawi, Mohd Nasrun Lee, Angela Noor, Mohamed Azman, Azhari Mohamad Kamar, Kamarul Anuar Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
description |
As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis
ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach.This traditional construction process
has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a numb
er of issues such as reworks, time delay, rising costs, lack of communication and
coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded. |
format |
Article |
author |
Mohd Nawi, Mohd Nasrun Lee, Angela Noor, Mohamed Azman, Azhari Mohamad Kamar, Kamarul Anuar |
author_facet |
Mohd Nawi, Mohd Nasrun Lee, Angela Noor, Mohamed Azman, Azhari Mohamad Kamar, Kamarul Anuar |
author_sort |
Mohd Nawi, Mohd Nasrun |
title |
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
title_short |
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
title_full |
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
title_fullStr |
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
title_full_unstemmed |
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects |
title_sort |
fragmentation issue in malaysian industrialised building system (ibs) projects |
publisher |
School of Engineering, Taylor’s University |
publishDate |
2014 |
url |
http://repo.uum.edu.my/10608/1/MNMN.pdf http://repo.uum.edu.my/10608/ http://jestec.taylors.edu.my/V9Issue1.htm |
_version_ |
1644280410841022464 |