Fragmentation issue in Malaysian Industrialised Building System (IBS) projects

As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by us...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Lee, Angela, Noor, Mohamed, Azman, Azhari, Mohamad Kamar, Kamarul Anuar
Format: Article
Language:English
Published: School of Engineering, Taylor’s University 2014
Subjects:
Online Access:http://repo.uum.edu.my/10608/1/MNMN.pdf
http://repo.uum.edu.my/10608/
http://jestec.taylors.edu.my/V9Issue1.htm
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.10608
record_format eprints
spelling my.uum.repo.106082016-04-18T03:08:11Z http://repo.uum.edu.my/10608/ Fragmentation issue in Malaysian Industrialised Building System (IBS) projects Mohd Nawi, Mohd Nasrun Lee, Angela Noor, Mohamed Azman, Azhari Mohamad Kamar, Kamarul Anuar TH Building construction As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach.This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a numb er of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded. School of Engineering, Taylor’s University 2014-02 Article PeerReviewed application/pdf en http://repo.uum.edu.my/10608/1/MNMN.pdf Mohd Nawi, Mohd Nasrun and Lee, Angela and Noor, Mohamed and Azman, Azhari and Mohamad Kamar, Kamarul Anuar (2014) Fragmentation issue in Malaysian Industrialised Building System (IBS) projects. Journal of Engineering Science and Technology, 9 (1). pp. 97-106. ISSN 1823-4690 http://jestec.taylors.edu.my/V9Issue1.htm
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Lee, Angela
Noor, Mohamed
Azman, Azhari
Mohamad Kamar, Kamarul Anuar
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
description As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach.This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a numb er of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.
format Article
author Mohd Nawi, Mohd Nasrun
Lee, Angela
Noor, Mohamed
Azman, Azhari
Mohamad Kamar, Kamarul Anuar
author_facet Mohd Nawi, Mohd Nasrun
Lee, Angela
Noor, Mohamed
Azman, Azhari
Mohamad Kamar, Kamarul Anuar
author_sort Mohd Nawi, Mohd Nasrun
title Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
title_short Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
title_full Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
title_fullStr Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
title_full_unstemmed Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
title_sort fragmentation issue in malaysian industrialised building system (ibs) projects
publisher School of Engineering, Taylor’s University
publishDate 2014
url http://repo.uum.edu.my/10608/1/MNMN.pdf
http://repo.uum.edu.my/10608/
http://jestec.taylors.edu.my/V9Issue1.htm
_version_ 1644280410841022464