Rock aggregates plant: A preliminary feasibility study
The proposed rock aggregates plant will be located in Mariveles, Bataan. The project will involve a total capital requirement of 16 million pesos. The project calls for the establishment of and operation of a 320 ton-per-hour stationary rock crushing, screening and washing plant, or an estimated out...
Saved in:
主要作者: | |
---|---|
格式: | text |
語言: | English |
出版: |
Animo Repository
1972
|
主題: | |
在線閱讀: | https://animorepository.dlsu.edu.ph/etd_masteral/155 https://animorepository.dlsu.edu.ph/context/etd_masteral/article/6993/viewcontent/TG00176_Fb.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | De La Salle University |
語言: | English |