A case study on mathematical odds and expectation and PERT/CPM project management
Saved in:
主要作者: | Miranda, Fernando M., Jr. |
---|---|
格式: | text |
語言: | English |
出版: |
Animo Repository
1972
|
主題: | |
在線閱讀: | https://animorepository.dlsu.edu.ph/etd_masteral/163 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | De La Salle University |
語言: | English |
相似書籍
-
Time-cost control via PERT/CPM
由: Guieb, Dennis A., et al.
出版: (1982) -
A qualitative assessment of Philippine-based marine conservation programs using a citizen science evaluation framework
由: Maglasang, Ma. Michelle J.
出版: (2021) -
Real estate project analysis: Obtaining the optimal strategy through PERT and CPM
由: Esteban, Ana Fe
出版: (2002) -
Efficient navigation for constrained shortest path with adaptive expansion control
由: XIA, Wenwen, et al.
出版: (2022) -
Critical-path-analysis-based dynamic component supplier optimization
由: Huang, X.G., et al.
出版: (2014)