Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology

This study is the result of Power Corporation management's intention to optimize their various capital investment decision processes withing the organization. The need of including qualitative factors in the selection of firm's capital investment projects gave impetus to an alternative mod...

Full description

Saved in:
Bibliographic Details
Main Author: Manalo, Marivic Valenzuela
Format: text
Published: Animo Repository 2008
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/faculty_research/12265
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
id oai:animorepository.dlsu.edu.ph:faculty_research-10667
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:faculty_research-106672023-04-13T02:42:35Z Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology Manalo, Marivic Valenzuela This study is the result of Power Corporation management's intention to optimize their various capital investment decision processes withing the organization. The need of including qualitative factors in the selection of firm's capital investment projects gave impetus to an alternative model called the project prioritization method (PPM) using as took the analytic hierarchy process. PPM is a process of selecting projects given the goals and limited resources of a company.Using Kendall tau distance, the projects classified under infrastructures, machineries and equipments are first ranked separately using the PPM and NPV models. The following is the result for the three capital project classifications: 1) infrastructure projects, 0.4; 2) machineries, 0.357; and 3) equipments, 0.411. All these values indicate low agreement in the rankings between the PPM and NPV models. Therefore, it can be concluded that the rankings for all the three capital project classifications under the two models are significantly different.Based on the results arrived through the Kendal tau distance, PPM can be considered as a system which is significantly different from the traditional NPV/IRR model, thus, the null hypothesis of the study that the ranking of capital investment projects using NPV, IRR and PI is similar to the rankiing using the PPM model is rejected. 2008-11-22T08:00:00Z text https://animorepository.dlsu.edu.ph/faculty_research/12265 Faculty Research Work Animo Repository Accounting
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
topic Accounting
spellingShingle Accounting
Manalo, Marivic Valenzuela
Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
description This study is the result of Power Corporation management's intention to optimize their various capital investment decision processes withing the organization. The need of including qualitative factors in the selection of firm's capital investment projects gave impetus to an alternative model called the project prioritization method (PPM) using as took the analytic hierarchy process. PPM is a process of selecting projects given the goals and limited resources of a company.Using Kendall tau distance, the projects classified under infrastructures, machineries and equipments are first ranked separately using the PPM and NPV models. The following is the result for the three capital project classifications: 1) infrastructure projects, 0.4; 2) machineries, 0.357; and 3) equipments, 0.411. All these values indicate low agreement in the rankings between the PPM and NPV models. Therefore, it can be concluded that the rankings for all the three capital project classifications under the two models are significantly different.Based on the results arrived through the Kendal tau distance, PPM can be considered as a system which is significantly different from the traditional NPV/IRR model, thus, the null hypothesis of the study that the ranking of capital investment projects using NPV, IRR and PI is similar to the rankiing using the PPM model is rejected.
format text
author Manalo, Marivic Valenzuela
author_facet Manalo, Marivic Valenzuela
author_sort Manalo, Marivic Valenzuela
title Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
title_short Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
title_full Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
title_fullStr Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
title_full_unstemmed Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
title_sort project prioritization method using analytic hierarchy process as a tool: an alternative capital rationing methodology
publisher Animo Repository
publishDate 2008
url https://animorepository.dlsu.edu.ph/faculty_research/12265
_version_ 1800918958788837376