An algorithm model for solving the single-period inventory transportation problems in the construction industry

An algorithm model for solving the single-period inventory transportation problems in the construction industry by Mohd Kamarul Irwan Abdul Rahim

Saved in:
Bibliographic Details
Main Author: Mohd Kamarul Irwan Abdul Rahim
Format: article
Language:English
Published: Tanjong Malim 2020
Online Access:https://ir.upsi.edu.my/detailsg.php?det=6200
https://ir.upsi.edu.my/detailsg.php?det=6200
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Pendidikan Sultan Idris
Language: English

Similar Items