FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED TUBING
Coiled tubing is extensively used in oil industry to clean the wellbore to increase the productivity of oil/gas well by removing the fill/sand downhole. Well cleanup operation for large diameter well with low bottomhole pressure is problematic and common cleanout fluids are not effective as a cir...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/id/eprint/22779/1/2013-MECHANICAL-FILL%20REMOVAL%20FROM%20HORIZONTAL%20WELLBORE%20USING%20FOAM%20IN%20COILED%20TUBING-JAVED%20AKBAR%20KHAN.pdf http://utpedia.utp.edu.my/id/eprint/22779/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
Language: | English |
id |
oai:utpedia.utp.edu.my:22779 |
---|---|
record_format |
eprints |
spelling |
oai:utpedia.utp.edu.my:227792024-07-24T01:57:55Z http://utpedia.utp.edu.my/id/eprint/22779/ FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED TUBING KHAN, JAVED AKBAR TJ Mechanical engineering and machinery Coiled tubing is extensively used in oil industry to clean the wellbore to increase the productivity of oil/gas well by removing the fill/sand downhole. Well cleanup operation for large diameter well with low bottomhole pressure is problematic and common cleanout fluids are not effective as a circulation fluid due to severe pressure losses and low suspension capability. In order to mitigate such effect, foam is used as a circulation fluid because it has the highest suspension power. Foam is formed by mixing water, air and additive. Due to complexity of foam rheology, it is challenging to accurately predict foam-solids flow behaviour during coiled tubing cleanout operation. 2014-11 Thesis NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/id/eprint/22779/1/2013-MECHANICAL-FILL%20REMOVAL%20FROM%20HORIZONTAL%20WELLBORE%20USING%20FOAM%20IN%20COILED%20TUBING-JAVED%20AKBAR%20KHAN.pdf KHAN, JAVED AKBAR (2014) FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED TUBING. Masters thesis, UTP. |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery KHAN, JAVED AKBAR FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED TUBING |
description |
Coiled tubing is extensively used in oil industry to clean the wellbore to increase
the productivity of oil/gas well by removing the fill/sand downhole. Well cleanup
operation for large diameter well with low bottomhole pressure is problematic and
common cleanout fluids are not effective as a circulation fluid due to severe pressure
losses and low suspension capability. In order to mitigate such effect, foam is used as
a circulation fluid because it has the highest suspension power. Foam is formed by
mixing water, air and additive. Due to complexity of foam rheology, it is challenging
to accurately predict foam-solids flow behaviour during coiled tubing cleanout
operation. |
format |
Thesis |
author |
KHAN, JAVED AKBAR |
author_facet |
KHAN, JAVED AKBAR |
author_sort |
KHAN, JAVED AKBAR |
title |
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING |
title_short |
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING |
title_full |
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING |
title_fullStr |
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING |
title_full_unstemmed |
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING |
title_sort |
fill removal from horizontal wellbore using foam in coiled
tubing |
publishDate |
2014 |
url |
http://utpedia.utp.edu.my/id/eprint/22779/1/2013-MECHANICAL-FILL%20REMOVAL%20FROM%20HORIZONTAL%20WELLBORE%20USING%20FOAM%20IN%20COILED%20TUBING-JAVED%20AKBAR%20KHAN.pdf http://utpedia.utp.edu.my/id/eprint/22779/ |
_version_ |
1805891074422472704 |