Parallel operation of unity power factor rectifier for PMSG wind turbine system

Offshore wind power has inspired the fields of high voltage direct current (HVdc) for advantages of high power transmission in long distance. Hefty wind generators are making advanced multilevel rectifier and parallel operation of rectifiers popular choice of research with the aim to accommodate hig...

全面介紹

Saved in:
書目詳細資料
Main Authors: Md Shafquat Ullah Khan, Maswood, Ali Iftekhar, Mohd Tariq, Tafti, Hossein Dehghani, Tripathi, Anshuman
其他作者: School of Electrical and Electronic Engineering
格式: Article
語言:English
出版: 2021
主題:
在線閱讀:https://hdl.handle.net/10356/151275
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English
實物特徵
總結:Offshore wind power has inspired the fields of high voltage direct current (HVdc) for advantages of high power transmission in long distance. Hefty wind generators are making advanced multilevel rectifier and parallel operation of rectifiers popular choice of research with the aim to accommodate higher power. Issues of reliability and complexity of control are associated with active power electronic devices at such high power. This paper focuses on the novelty of operation of parallel three-phase diode rectifiers each with auxiliary bidirectional switching blocks (BSB) to improve their performance. For the system, maximum percentage power is commuted through the three-phase diode rectifier and paralleling further lessens the current stress on the semiconductor switches present in the BSBs. Competence of continuous operation at times of any specific branch failure provides the proposed system with higher modularity and reliability. The paralleled topology is controlled to obtain unity power factor at the generator output with low generator output-current harmonics using hysteresis current control. The dc-link voltage is controlled at a reference value, for various dynamic variations along with balanced capacitor voltages. The permanence of the proposed system is simulated for scenarios associated with variation of wind speed and load demands while various operation modes are tested on a 2.5-kW experimental setup.