An effective approach for scheduling coupled activities in development projects
10.1016/j.ejor.2014.11.019
Saved in:
Main Authors: | Lin J., Qian Y., Cui W., Goh T.N. |
---|---|
其他作者: | INDUSTRIAL & SYSTEMS ENGINEERING |
格式: | Article |
出版: |
Elsevier
2016
|
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/128069 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Development projects scheduling and design structure matrix
由: Qian, Y.J., et al.
出版: (2014) -
A novel approach to DSM-based activity sequencing problem
由: Qian, Y., et al.
出版: (2014) -
A heuristic approach to scheduling university timetables
由: Loo, E.H., et al.
出版: (2014) -
Effects of Erroneous Estimation of Activity Durations on Scheduling and Dispatching a Single Project
由: Yang, Kum Khiong
出版: (1996) -
Effects of erroneous estimation of activity durations on scheduling and dispatching a single project
由: Yang, K.-K.
出版: (2013)