CHOON, O. H., & ENGINEERING, D. O. C. &. E. (2019). ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON.
Chicago Style CitationCHOON, OH HONG, and DEPT OF CHEMICAL & ENVIRONMENTAL ENGINEERING. ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON. 2019.
MLA CitationCHOON, OH HONG, and DEPT OF CHEMICAL & ENVIRONMENTAL ENGINEERING. ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON. 2019.
Warning: These citations may not always be 100% accurate.