FENG, Z., & ENGINEERING, M. &. P. (2020). MODELLING AND SCHEDULING OF FMSS BASED ON OBJECT ORIENTED CTPN AND HEURISTICS.
Chicago Style CitationFENG, ZHANG, and MECHANICAL & PRODUCTION ENGINEERING. MODELLING AND SCHEDULING OF FMSS BASED ON OBJECT ORIENTED CTPN AND HEURISTICS. 2020.
MLA CitationFENG, ZHANG, and MECHANICAL & PRODUCTION ENGINEERING. MODELLING AND SCHEDULING OF FMSS BASED ON OBJECT ORIENTED CTPN AND HEURISTICS. 2020.
Warning: These citations may not always be 100% accurate.