Li, W., Goh, M., Wu, Y., Petering, M., De Souza, R., Wu, Y., & SCIENCES, D. (2013). A continuous time model for multiple yard crane scheduling with last minute job arrivals.
Chicago Style CitationLi, W., M. Goh, Y. Wu, M.E.H Petering, R. De Souza, Y.C Wu, and DECISION SCIENCES. A Continuous Time Model for Multiple Yard Crane Scheduling With Last Minute Job Arrivals. 2013.
MLA引文Li, W., et al. A Continuous Time Model for Multiple Yard Crane Scheduling With Last Minute Job Arrivals. 2013.
警告:這些引文格式不一定是100%准確.