Chua, D., LIJUN, S., & ENGINEERING, C. (2014). Key constraints analysis with integrated production scheduler.
استشهاد بنمط شيكاغوChua, D.K.H., SHEN LIJUN, و CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
MLA استشهادChua, D.K.H., SHEN LIJUN, و CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.